CourtMesh

Section 27: Speed of trains

Bangalore Metro Railway (General) Rules, 2011Central Rules · 2002

(1) Every train shall be run on each line of the Bangalore Metro Railway within the limits of speed as specified in the approved special instructions.

(2) The speed of the trains in Automatic Train Operation Mode shall be automatically controlled by the Continuous Automatic Train Control system.

(3) In Automatic Train Protection mode. the train operator shall regulate the speed of trains according to the cab signals. the maximum permissible speed shall not be exceeded and the speed of the train shall be such that it can be stopped within the distance indicated, as being the limit of safety, the failure to do so shall result in irrevocable application of emergency brakes which shall be viewed as a failure on the part of the Train Operator.

' .

[ '11'1 II-� 3(i)]

(4) In Restricted Manual mode, the maximum speed of the trains shall only be automatically regulated, to twenty five kilometer per hour and the train operator shall further restrict the speed as required by special instructions while operating in this mode on run on sight.

(5) In Cut out mode, the speed of train shall be manually regulated by the train operator as required up to a maximum speed of twenty five kilometer per hour

(6) The maximum speed of trains in shunting shall not exceed ten kilometer per hour.

(7) The speed of other rail borne vehicles shal! be restricted as provided in special instructions.

(8) The speed of train in condition of low visibilit\' while operating in Restricted Manual mode or Cut out mode shall be governed by srecial instructions.

Where this provision sits

ActBangalore Metro Railway (General) Rules, 2011
Section27
Marginal noteSpeed of trains
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Bangalore Metro Railway (General) Rules, 2011 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.