Section 52: Flooding

Bangalore Metro Railway (General) Rules, 2011Central Rules · 2002

(1) Any train operator or Station Controller or the other member of the staff, who observes water accumulating on the track, shall report to the Traffic Controller giving as much detail as possible with respect to location, distance of track affected, and level of water with respect to the rail.

(2) The Traffic Controller shall inform all trains required to pass through the area and request reports of the state of the water level and if the water level is below the level of rail fastenings, the Traffic controller shall instruct the train operator to reduce the speed of their trains to twenty five kilometer per hour when passing through the affected area.

(3) If the water level rises above rail fastenings, passenger train service shall only be permitted under special instructions.

Where this provision sits

ActBangalore Metro Railway (General) Rules, 2011
Section52
Marginal noteFlooding
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Bangalore Metro Railway (General) Rules, 2011 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.