(1) All real time operational data as required by the Appropriate Load Despatch Center shall be furnished by the Entities.
(2) All data required by Regional Power Committee, in discharge of the responsibilities assigned to it, shall be furnished by Regional Load Despatch Centre (RLDC).
(3) All operational data, including disturbance recorder and event logger reports, for analysing the grid incidents and grid disturbance and any other data which in its view can be of help for analysing grid incident or grid disturbance shall be furnished by all Page 13 of 19 the Entities within twenty four hours to the Regional Load Despatch Centre and concerned Regional Power Committee.
(4) All equipment such as disturbance recorders and event loggers shall be kept in healthy condition, so that under no condition such important data is lost.
(5) A real time operation display of the grid position shall also be made available to the Regional Power Committee by Regional Load Dispatch Centre.
(6) Regional Load Dispatch Centre shall classify the grid incidents and grid disturbances according to regulation 11, analyse them and furnish periodic reports of grid incidents and grid disturbances to the Regional Power Committee which shall recommend remedial measures to be taken on the Report of Regional Load Despatch Centre to prevent recurrences of such grid incidents and grid disturbances.