CourtMesh

Section 13: In regulation 17 of the said regulations for sub-regulations (2) and (3), the following shall be substituted, namely

Central Electricity Authority (Installation and Operation of Meters) (Amendment) Regulations, 2019Central Regulations · 2003

“(2) (a) The licensee shall set up accredited testing laboratories or utilise the services of other accredited testing laboratories.

(b) The licensee shall take immediate action to get the accreditations for their existing meter testing laboratories from NABL, if not already done.

(3) The generating company or licensee shall ensure that all type, routine and acceptance tests are carried out by the manufacturer complying with the requirement of the relevant Indian Standards.”.

14. In regulation 18 of the said regulations,-

(i) in sub-regulation (1), for clauses (b) and (c), the following shall be substituted, namely: - “(b) All Interface Meters shall be tested on-site using accredited test laboratory for routine accuracy testing at least once in five years and recalibrated if required.

Provided that these meters shall also be tested whenever the energy and other quantities recorded by the meter are abnormal or inconsistent with electrically adjacent meters.

(c) Testing and calibration of Interface Meters shall be carried out in the presence of the representatives of the supplier and buyer by giving the advance notice to the other party regarding the date of testing.”;

(ii) for sub-regulations (2) and (3), the following shall be substituted, namely: - “(2) Consumer Meters: The testing of Consumer Meters shall be done at site through accredited test laboratory at least once in five years and recalibrated, if required:

Provided that the licensee instead of testing the meter at site can remove the meter and replace the same by a meter duly tested in an accredited test laboratory:

Provided further that meter shall be tested if the consumption pattern changes drastically from the similar months or seasons of the previous years or if there is consumer’s complaint pertaining to a meter:

Provided also that the meter used for testing shall be of better accuracy class than the meter under test.

(3) Energy Accounting and Audit Meters: Energy Accounting and Audit Meters shall be tested at site through accredited test laboratory at least once in five years or whenever the accuracy is suspected or whenever the readings are inconsistent with the readings of other meters, e.g., Check Meters, Standby Meters and defective meters shall be recalibrated, if required:

Provided that the testing shall be carried out without removing the Instrument Transformers connection.”.

15. Regulation 20 of the said regulations shall be omitted.

Where this provision sits

ActCentral Electricity Authority (Installation and Operation of Meters) (Amendment) Regulations, 2019
Section13
Marginal noteIn regulation 17 of the said regulations for sub-regulations (2) and (3), the following shall be substituted, namely
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Central Electricity Authority (Installation and Operation of Meters) (Amendment) Regulati… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.