Section 132: Earthing requirements

Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023Central Regulations · 2003

(1) Converter transformer shall be provided with separate perimeter earthing conductor.

(2) The line side neutral of the converter transformer bank shall be earthed at one point only.

(3) Every part of support structure circumference of the air cored reactor shall be earthed in a manner such that it is not forming closed loops.

(4) Radio Frequency Interference screen of valve hall shall be electrically connected and effectively earthed.

(5) Metallic sheet, prefabricated structure members and trusses housing high voltage direct current apparatus shall be electrically connected and effectively earthed.

(6) Insulating pads or sleeves shall be provided between the steel reinforcement components, in foundation beneath the smoothing reactor, wherever they are crossing each other.

Chapter XIII Additional safety requirements for gas insulated substation

Where this provision sits

ActCentral Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023
Section132
Marginal noteEarthing requirements
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulatio… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.