CourtMesh

Section 5: Performance requirement

Central Electricity Authority (Technical Standards for Communication System in Power System Operation) Regulations, 2020Central Regulations · 2003

(1) User shall be capable of transmitting all operational data as required by appropriate control centre.

(2) Communication system shall relay the control command from the control centre to relevant equipment within two seconds for supervisory control and data acquisition and within one second for wide area measurement system, whether the command is transmitted directly or via data concentrator.

(3) Communication system shall be planned with required bandwidth to conform the data interval time as specified in Schedule-I.

Where this provision sits

ActCentral Electricity Authority (Technical Standards for Communication System in Power System Operation) Regulations, 2020
Section5
Marginal notePerformance requirement
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Central Electricity Authority (Technical Standards for Communication System in Power Syst… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.