Section 27: Charges for long term and medium term open access in transmission

The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Relate…State Regulations of Himachal Pradesh · 2003

(1) The long term and medium term open access customers shall pay the transmission charges, operating charges, unscheduled inter-change charges and reactive energy charges as the Commission may, in exercise of its powers under sections 61, 62, 86 and other provisions of the Act, determine from time to time.

(2) Transmission and operating charges.- The transmission and operating charges payable by a long-term and medium-term customer for use of the transmission system shall be determined in accordance with the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2007 and shall be based on the prevailing costs, prices and methodology of sharing of transmission charges specified by the Commission. However, no upfront fee or charges shall be levied by the utility on open access customers and all costs in relation to the transmission shall be subsumed in the transmission charges.

(3) Unscheduled Inter-change (UI) Charges.- (a) Scheduling of all transactions pursuant to grant of long-term open access and medium-term open access shall be carried out on dayahead basis in accordance with the Grid Code .

(b) Based on net metering on the periphery of each intra-State entity, composite accounts for Unscheduled Interchanges shall be issued for each intra-State entity on a weekly cycle.

(c) Any mismatch between the scheduled and the actual drawl at drawl points and scheduled and the actual injection at injection points for the intra-State entities shall be determined by the State Load Despatch Centre and covered in the intra-State Unscheduled Interchanges accounting scheme.

1 Sub- regulation (3) added vide Not. No. HPERC/ 418 dated 7 th December, 2012 published in the R H.P. dated 10 th December, 2012 at p. 5409-5415.

Compendium of HPERC Regulations, March 2021 15

(d) The Unscheduled Interchanges rates for intra-State entity shall be 105% (for over-drawls or under generation) and 95% (for under-drawls or over generation) of the inter-State Unscheduled Interchanges rates.

(4) Reactive energy charges .- The reactive energy drawls, injections and the payment, receipt of the reactive energy charges by the open access customers shall be in accordance with the relevant provisions of the Grid Code.

Where this provision sits

ActThe Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010
Section27
Marginal noteCharges for long term and medium term open access in transmission
JurisdictionState of Himachal Pradesh
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.