CourtMesh

Section 33: Metering and Accounting

The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011State Regulations of Himachal Pradesh · 2003

For metering and accounting, the provisions of 1 [the regulations framed by the Central Electricity Authority (CEA) under section 177 (c) and] the Himachal Pradesh Electricity Grid Code, as amended from time to time, shall be applicable.

2 [34. Safety Standards .- The generating company shall develop a safety manual and comply with regulations framed in this regard by the Central Electricity Authority (CEA) under section 53 and section 177 (2) (b) of the Act.]

PART-V MULTI YEAR TARIFF FILING PROCEDURE 3 [35. Multi-Year Fillings for the control period .- (1) “For the Approval of the Commission, the multi-year ARR and tariff filing for each year of the control period 1 Ins. vide Not. vide Not No. HPERC/F (5)(3)(1) (Gen.) dated 1 st Nov., 2013 published in the R H.P.

dated 4 th November, 2013 at p. 4599-4606. Before insertion Regulation 33 read as under:- “33. Metering and Accounting.- For metering and accounting, the provisions of the Himachal Pradesh Electricity Grid Code, as amended from time to time, shall be applicable.” 2 Subs. vide Not. No. HPERC/F (5)(3)(1) (Gen.) dated 1 st Nov., 2013 published in the R H.P. dated 4 th November, 2013 at p. 4599-4606 and before its substitution regulation 34 it stood as under:

“34. Safety Standards .- The generating company shall develop a safety manual and follow procedures to maintain minimum safety standards during construction, operation, etc. in line with the provisions of section 53 of the Act.” 3 Subs. vide vide Not No. HPERC/F (5)(3)(1) (Gen.) dated 1 st Nov., 2013 published in the R H.P.

dated 4 th November, 2013 at p. 4599-4606 and before its substitution regulation 35 read as under:- “35. Multi-Year Filings for the control period.- (1) The multiyear tariff filing shall be in such form and in such manner as may be laid down by the Commission by an order and also as per the provisions of the Conduct of Business Regulations.

26 Compendium of HPERC Regulations, March 2021 consistent with the business plan, shall be done by the petitioner generator not less than 120 days before the commencement of the first year of the control period or such other date as may be directed by the Commission, in such form and in such manner as may be laid down by the Commission by an 1 order and also as per the provisions of the Conduct of Business Regulations.

(2) The applicant shall also submit the multi-year ARR and tariff filing in electronic format to the Commission.]

Where this provision sits

ActThe Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011
Section33
Marginal noteMetering and Accounting
JurisdictionState of Himachal Pradesh
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determin… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.