CourtMesh

Section 31: Conditions on which the extraction of minor mineral permit shall be granted

the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015State Rules of Himachal Pradesh · 1957

(1) The depth of mining in the river bed shall not exceed one metre or water level whichever is less:

Provided that where the Joint Inspection Committee certifies about excessive deposition or over accumulation of minerals in certain reaches requiring channelization, it can go upto two metres on defined reaches of the river.

29

(2) The minor mineral permit granted under these rules may contain such other conditions as the officer granting the permit may deem necessary in regard to the following:-

(i) the limit, mode and place of payment of rates and royalties;

(ii) compensation of damage to the land covered by the permit;

(iii) felling of trees;

(iv) restriction of surface operations in any area prohibited by any authority;

(v) entering and working in any reserved or protected forest;

(vi) reporting all accidents;

(vii) indemnity to Government against claim of third parties;

(viii) period within which the minor mineral shall be extracted and removed and delivery of possession over lands on the expiry of such period or on removal of the quantity of the minor mineral for which the permit is valid;

(ix) deposit of security under Head "Revenue Deposits - Security Deposits" for due fulfilment of the conditions of the permit;

(x) release of security by the authority issuing permit after having satisfied that the permit holder has fulfilled all the conditions of the permit satisfactorily;

(xi) proper maintenance and clearance of the road where the quarries are located on the road-side;

(xii) responsibility to safeguard the water pipe, electric poles and wiring and other public property on the area covered under the permit and in vicinity of the same;

(xiii) mechanical mining in river and stream bed shall be allowed only with the help of tyre mounted front end loader upto 80 Horse Power without backhoe with the permission of the Director. The permit holder seeking such permission shall deposit security amount as specified in the First Schedule.

The Director may permit the use of mechanical mining subject to the following terms and conditions:

(a) depth of the pit below the surface shall not exceed 1 metre from the adjoining ground in case of river/stream bed;

(b) natural flow of the water shall not be disturbed;

(c) the excavation of mineral shall be done by way of uniform stripping of mineral in a scientific manner;

(d) any other condition imposed by the competent authority; and

(e) any violation of terms and conditions imposed while granting such permission shall result in cancellation of permit and forfeiture of security amount thereof:

Provided that the permit holder may use any type of excavator in case of hill slope mining.

30

Where this provision sits

Actthe Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015
Section31
Marginal noteConditions on which the extraction of minor mineral permit shall be granted
JurisdictionState of Himachal Pradesh
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mini… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.