Section 9: Application by a licensee

The Indian Telegraph Right of Way Rules, 2016Central Rules · 1885

(1) A licensee shall, for the purposes of establishing overground telegraph infrastructure, upon any immoveable property vested in or under the control or management of any appropriate authority, make an application, supported by such documents, to that appropriate authority in such form and manner as may be specified by that appropriate authority.

(2) The information along with supporting documents to be provided by the licensee in the application made under sub-rule(1) shall include-

(i) a copy of the licence granted by the Central Government;

(ii) the nature and location, including exact latitude and longitude, of post or other above round contrivances proposed to be established;

(iii) the extent of land required for establishment of the overground telegraph infrastructure;

(iv) the details of the building or structure, where the establishment of the overground telegraph infrastructure, is proposed;

(v ) the copy of approval issued by the duly authorised officer of the Central Government for location of the above ground contrivances proposed to be used for the transmission of Radio waves or Hertzian waves;

(vi) the mode of and the time duration for, execution of the work;

(vii) the inconvenience that is likely to be caused to the public and the specific measures proposed to be taken to mitigate such inconvenience;

¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 11

(viii) the measures proposed to be taken to ensure public safety during the execution of the work;

(ix) the detailed technical design and drawings of the post or other above ground contrivances;

(x) certification of the technical design by a structural engineer attesting to the structural safety, of the overground telegraph infrastructure;

(xi) certification, by a structural engineer, attesting to the structural safety of the building, where the post or other above ground contrivances is proposed to be established on a building;

(xii) the names and contact details of the employees of the licensee for the purposes of communication in regard to the application made;

(xiii) any other matter relevant, in the opinion of the licensee, connected with or relative to the work proposed to be undertaken; and

(xiv) any other matter connected with or relevant to the work as may be specified, through a general or special order, by the Central Government or appropriate State Government or appropriate local authority.

(3) Every application under sub-rule (1) shall be accompanied with such fee to meet administrative expenses for examination of the application and the proposed work as the appropriate authority may, by general order, deem fit:

Provided that the one-time fee, to meet administrative expenses, accompanying every application shall not exceed ten thousand rupees.

Where this provision sits

ActThe Indian Telegraph Right of Way Rules, 2016
Section9
Marginal noteApplication by a licensee
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? The Indian Telegraph Right of Way Rules, 2016 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.