(1) After handing over the possession of land to the land owner / occupier, the Corporation who laid the Water, Gas or Drainage Pipelines the persons authorized by the Corporation shall have the power to enter in the land and do the work as found necessary for inspection, maintenance, repair, replacement or removal of the Water, Gas or Drainage Pipelines.
(2) If the land owner or occupier refuses to sign any form, which he or she is required to sign under these rules, the same shall be signed by the Completent Authority, provided the procedure under these rules has been followed.
12. Cost of acquisition of right of user by requisitioning body
(1) The establishment charge and contingency cost for the right of user by requisitioning body / corporation shall be 5 percent of the total value of compensation assessed under rule 7.
(2) The requisitioning body / corporation shall deposit the establishment charge and the contingency cost, as calculated under rule 12 (1) by way of bank draft to the Collector and the Collector shall deposit the cost of user land in the Deposit account in the district treasury or in a scheduled bank account maintained separately for this purpose to be jointly operated by Competent Authority and Deputy Commissioner.