Section 40: Metering

JSERC (open access inter state transmission & distribution) regulation 2005State Regulations of Jharkhand · 2003

(i) The open access consumer shall provided Special-Energy Meters as Main Meters as may be specified by the S•U and approved by the Commission for· such consumer based on voltage, point 'and period of supply and tariff category and incorporated in Grid Code and metering code of distribution licensees and shall provide communication of metering data to SLDC on read time basis and periodically as_desired by SLDC.

(d) Point(s) of drawal;

(e) Transmission systems/distribution system used (on the basis of region and ownership);

(f) Reserved capacity;

(g) Applicable rate (Rs. per MW per day); and

(h) Actual load factor.

N.ote.-AII previous reports shall also be available in the web-achieves.

(iv) Information regarding usage of the links between various state licensees indicating:

(a) Time of updating;

(b) Name of the link;

(c) Total capacity of the link;

(d) Scheduled capacity use (giving customer-wise break-up); and

(e) Current capacity of the link in use.

Note.-This Information should be updated at least on any hourly basis, and wi-u::re ever tsastble on ~ 5 minute basis.

11 .I I ..

108] Jhari<hand Local Acts r ;::,,"g .. ~1· /

(ii) The generating company or a licensee contracting to eftect supply to a-: / open access consumer. shall provide Special Energy Meters as Main Meters , I I interconnecting points as specified in metering code and shall arrange communicatio f of metering date to Regional Load Despatch Centre and/or State Load Despatc] Centre on real time basis and periodically as desired by SLDC. i I I · (iii) The Distribution licensee may provide Check Meters of the same 11 specification as Main Meters. 1 1

(iv) The Main and Check Meters shall be periodically tested and calibrated by / Licensee/State Transmission Utility in the presence of others party involved. Maiin /' and Check meters shall be sealed by both parties. Defective meter shall be / replaced immediately. .

(v) Reading of Main and Clieck meters shall be taken periodically at appointed/ day and hour by authorised officer of distribution licensee and open ·access customer o; his representative, _if present. Meter· ;eading shall be immediat~ly/ communicated to State Load Despatch Cantre, consumer State Transmission;

Utility and Generating C<?fnpany/trader, as the case may be, by the distribu~b~ (1~~.~~~':'-~!~~i.~,.}~~ hh~u:5,;f:;;.7,:-,,~:.ter ;ea~lngs shall. be considered when fv!ai1 IVlt:1\CI.:.:, 0.1,0 IVUI IY ,..., ..,...., ......... , __ .. :. - - . stopped: I . . I

Provided that if difference between the readings of main and check meter/visf 3-•1is main meter reading exceeding twice !he percentage error appticable :p relevant c!ass, both meters shall be tested and one found defective shall· b~ Immediately replaced and reading otother will be considered: · I I

Provided further that dlstrlbutlon licensee for the purpose of this clause ~hdll be the distribution licensee operating and maintaining dlstributlon system o,i trle area ir. which consumer premises are located. · /

(vi) An open access customer or generating company or licensee may request STU to provide Special Energy Meters. In that case ·he shall pay for the 'cost, installaticn and maintenance of meters as per the charges approved by the Commissionand the meter shall be maintained by STU. · i·

(vii) Mair\ and Check Meters shall have facility to communicate it reading' to Stats Load Despatch Cent;e on real time basis or otherwise as may be specified in metering code, and. !

{viii) The term 'Meter' shall include current transformers, voltage/potential transformers, wiring bstwaen them and meter box/panel. '.

Where this provision sits

ActJSERC (open access inter state transmission & distribution) regulation 2005
Section40
Marginal noteMetering
JurisdictionState of Jharkhand
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? JSERC (open access inter state transmission & distribution) regulation 2005 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.