(i) (a) The long-term access shal! be allowed to the Intra-State transmission system in accordance with the transmission planning criterion stipulated in the Grid Code.
(b) The long-term access to distribution system shall be allowed in accordance with distribution planning criteria of the distribution licensee approved by the Commission.
(o) Provided that !orig-term access to intra-State transmission system and distribution system shall _be allowed to Open Access Customers phasewise from the dates as specified in Clause 34 of these Regulations.
(ii) The short-terms access to Intra-State transmission system and distribution system shall be allowed, if request can be accommodated by utilizing:- ·
(a) Inherent design margins;
(b) Margins available due to variation· in power flows: and
(c) Margins available due to in-built spare capacity created to cater to future load growth;
.inarknano Local Acts SS] I I I.
(d} Margins available due to part use/non-use or capacity:
Provided that short-terms access shall be allowed to Open Access Customers phase wise from dates as specified Clause 34 of these Regulations.·