(1) A person who intends to construct a permanent cinema building or multiplex or convert an existing building into a permanent cinema building or multiplex shall first make an application to the Licensing Authority in Form ‘A’. The applicant shall also put up a notice in Form 'B' in this behalf on a board on the proposed site or the building to be converted as the case may be, in such a position that it can be prominently visible and can be seen from the public thoroughfare. Such notice shall be in kannada and English. The notice on the Board shall be on display until the application for licence is decided by the Licensing Authority. The Board shall be at least 1.25m x 1.00 m in size and the notice shall be in bold and clearly legible letters.
(2) The application shall be accompanied by._
(i) an extract of a town map drawn correctly to scale in six copies with one original plan printed on tracing film and also in digital format, and six prints or copies of the same map shall be provided clearly indicating the surrounding roads and buildings which exist up to a distance of 500 meters and 1000 meters in case of drive- in cinemas from the proposed site, the distance of all educational institutions, hospitals, places of worship or other places of public importance from the said site are also be shown.
(ii) The site plan in original printed on tracing film and also in digital format with six prints drawn correctly to scale of not less than 1:500 indicating therein the block levels, showing position of the cinema or multiplex and its premises in relation to any adjacent buildings, out-houses and other structures, sub-ways, roads, passages, wells, cisterns, hydrants , if any, drains, water sewer and gas mains, underground cables, overhead high and extra high voltage lines, telegraph and telephone lines, high flood marks of nearby river or nalas, maximum water level of adjacent reservoirs, tanks, water level of adjacent wells, if any in the rainy season within the site and giving the size of the site as well as the proposed built and open areas in square meters together with number of seats to be accommodated; and
(iii) The treasury challan for having credited the fees as notified by the Government from time to time for the grant of No Objection Certificate.