"APPENDIX M Time limits for the various activities SI. Activity Regulation/ Time limit Authority /Person No. Provision in IBR I Issue of Welder qualification 614 5 days Competent Authority certificate m Form Xll after submission of satisfactory reports -
2. Approval of design anu 393(a) (i) 5 J ays for boilers Inspecting Authority manufacturing drawings for boil ers components & boilers and boiler components made in lnuia upto 20 TPH capacity.
(ii ) 15 days for boil ers above 20 TPH & upto I 00 TPH capacity
(iii) 2 1 days for boilers above I 00 TPH capacity ---·- - - .
12 J.
4.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
T HE GAZETTE OF IND IA: EXTRAORDI NARY [PART II- S EC. J( i)] Approval of materia ls fo r boil ers and boiler components made outside India Approval of des ign and manufacturing drawings for boilers and boiler components made out:; ide India 393(b) 39J(b)
(i) 5 days, in c.ise of s.i me ma teri.i ls as previously approved for the same design pressure & temperature (i i) IO days, in other cases 21 days Techn ica l Adviser(Bo ilers) Chief Inspector of Boilers Inspection during .;v11:.l1 ;,diun/ Append1x-J 2 days Inspecting Authority/ Competent Person manufacture Issue of Certificate for manufacture 4(c)(I ) (i) J days for boiler Inspecting Authority and test Issue of Inspecting Authorit y Certificate during erection in "Form llC" Issue of provisional order in Form-Y after registration inspection Assigning of Registration No. for boilers • Steam Tests of boiler Issue of Certificate for use of boiler in Form-VI Permission to carry out repairs/alterations in boilers Recognition of repairers boilers & steam pipes Transfer of Memorandum of Inspection Book & Registration Book Submission of Remnant Life Assessment report/ recommendations 4(c)( I l 38 1 (c) 386(d) 380(a) 3S9 392(iv)(b) 392(5) 388 391A components.
(ii) 7 days for boiler 2 days Inspecting Authority 48 Hours Inspector
30. days Chief Inspector of Boilers 30 days Inspector 48 Hours Competent Person 2 days Chief Inspector of Boilers 30 days Chieflnspector of Boilers 15 days Chief Inspector of Boilers 30 days from datt: of Wdl Known Remnant completion of inspection/ Life Assessment tests Organisation Note : (I) Above time limits shall be applicable from th<:: date of submission of complete details/documents.
(2) After expiry of prescribed time limits for an ac tivity, approval for that activity shall be deemed to have been granted.".
[F. No. 6(4)/2016-Boilers] T. S. G. NARA YANN EN, Secy. Central Boilers Board Note: The principal regulations were published in the Gazette of India, vide, number S.O. 600, <lated the I 5th day of September, 1950 and last amended vide G.S.R. 664(E), dated the 26th August, 2015.