(1) Planning Norms for the buildings having height above 12.5 meters and up to 30 meters shall be as given in Table No 4.
Sr No.
(1)
1.
2.
3.
"l{~ ~. ~ 14 i:rr;:f 2016 222 (211) TABLENo.4 .
[See rule 58(1 )] DEVELOPMENTNORMSFORPLOTS/LANDSONWHICH BUILDING(S) WfnIHEIGHf ABOVE 12.S M AND UPTO 30 MIS_ PROPOSED:
Road Minimum Frontage FAR_ Ground Building Front Sides/ Width plot/ laµd (in meters Coverage Height M.O.S Rear (in .
in (in meters) • 'in MOS area \.
meters) ( in oercentage meters) (in meters) Sq.m.)
(2) (3) (4) (5) (6) . (7) (8) (9) 12m 1000 sq.m 18m 1:1.50 30 Upto 18 7.5 6.0 and meter above 18m & 1500 sqm 21 m 1:1.75 30 Upto24 9.0 6.0 above 24m 2000 sqm 30m 1:2.00 30 Upto30 12.0m 7.5m ~d meter above Note: Where • the use premises is commercial, the grourid coverage mentioned in column 6 above shall be read as 40.
(2) For High Rise Buildings as defined in rule 2(38):· For high rise building Planning Norms shall be as given in Table No 5.
s ..
No.
(1)
1.
TABLENo.S [See rule-58 (2) above] DEVELOPMENT NORMS FOR PLOTS/ LANDS ON wmcH IDGH RISE BUILDING(S) IS PROPOSED Road Min. Frontage FAR Ground Building M.O.S front MOS width plot/land in meters Coverage in Height side in sides/ in size (area % in meters rear meters in Sq.M.) meters
(2) (3) (4) (5) (6) (7) (8) (9) 30m 2500 30m 1:2.25 30 Upto45 15.00 m 7.5m and meters above 222 (212) l=j'~ ~. ~ 14 l=Jft:f 2016 s. Road Min. Frontage FAR Ground Building M.O.Sfron1 MOS No. width plot/land in meters Coverage in ·Height side in sides/ in size (area % in meters rear meters in Sq. M.) meters
(1) (2) (3) • (4) (5) (6) (7) (8) (9)
2. 36m 3000 40m 1:2.50 30 Upto60 18.00 m 9.0m ~d meters above ~. ~Sm 3500 45m 1:2.75 30 . Upto-75 21.0m 9.0m and meters above
4. 60m 4000 50m 1:3.0 30 Upto90 24.00 10m and meters above
5. 75m 4500 60m 1:3.0 30. above90 30.00 12m and meters above
(3) For building having height more than 12.5 meters the necessary drawings and details shall be submitted to the Agency incorporating all the fire fighting measures recommended in National Building Code Part-IV.
The occupancy permit shall be issued only after ensuring that all fire fighting measures are physically in place.
(4) For ·all high rise buildings site clearance under sub-rule (2) of Rule 18.
shall be necessary. After site clearance by. the committee composite building permission from-the Agency shall be necessary.
( 5) The approach to the building and. open spaces on its all sides shall be as hard as is required to bear the weight of fire engine. The said open §pace shall be kept free of obstruction and shall be motor-able. • ( 6) Main entrance to the plot shall be of adequate width to allow easy access to the fire engine and·in no case it shall measure less than 6.0 meters. The entrance gate shall fold back against the compound wall of the premises, thus leaving the exterior access way within the plot free for movement of fire service vehicles. If the main entrance at the boundary wall is built over, the minimum clearance shall be 4.5 mete.rs.
590 Cul-De-Sacs.- Cul-de-sacs giving access to plots will be allowed provided that cul-de-sacs would be permissible only on straight roads and the turning space shall not be less than 121 square meters in area with no dimension being less than 11 meters.