CourtMesh

Section 47: Delegation of powers

Marble Development and Conservation Rules, 2002Central Rules · 1957

The State Government may, by notification in the Official Gazette, direct that any power exercisable by it under these rules may, in relation to such matters and subject to such conditions, if any, as may be specified in the notification be exercisable also by such officer or authority subordinate to the State Government

SCHEDULE FORM –A (Yearly Report of Prospecting Operations carried out) (See rule 11) To State Government concerned or any person so authorised under rule 47

1. Type of the marble for which prospecting : (a) operations has been granted (b)

2. Name and address of the licencee :

3. Particulars of the prospecting licencee :

(i) Date of execution :

(ii) Period : Years From : to :

(iii) Area under licence : Hectares

(iv) No. and date assigned by State Government to Prospecting Licencee. No. Date :

4. Location of the prospecting licenced area :

(i) Topo Sheet Number :

(ii) Cadastral Survey or Khasra Number :

(iii) Village : Taluka/Tehsil : District : State :

(iv) Post Office : Police Station :

(v) Nearest railway station : Distance :

(vi) Nearest Rest House/Dak Bungalow :

5. Particulars of the Geologist or mining Engineer employed optionally, if any, for the prospecting licenced area:

(i) Name and address :

:

:

(ii) Qualification :

(iii) Date of appointment :

(iv) Status of employment : Whole time : Part time :

6. Status of Prospecting Operation: In Progress :

please tick mark one of the boxes Completed :

whichever is applicable Abandoned :

7. Total Surface area covered by prospecting work (hectare) :

8. Prospecting work completed during the year :

a. Geological mapping : Area in Hectare : Scale :

b. Pitting (i) No. of Pits :

(ii) Grid Pattern :

(iii) Depth (Mts.) Average :

Maximum :

Minimum :

c. Trenching (i) No. of trenches (with interval) :

(ii) Length (Mts) Average :

Maximum :

Minimum :

d. No. and size of samples :

e. Drilling :

(i) No. of boreholes completed during the year (with size of core) :

(ii) No. of boreholes in progress :

(iii) Total yearly drilling (Mts.) :

f. Particulars of drilling machines Type Make Capacity No.of drills g. Details of samples tested:

(i) No. of samples tested :

(ii) Complete report :

(Testing the suitability as per market requirement) Place : Signature :

Date : Name in full :

Designation :

________________________________________________________________________ Note : Please enclose a geological report describing the prospecting operations undertaken so far accompanied by the detailed geological plans and sections showing structural details such as joints, fractures, folds, faults, grain size, texture etc. and also showing locations of (a) bore holes, (b) pits, (c) trenches

(d) sample positions etc. The report shall also contain the bore hole logs and the inferences drawn as a result of the study of the geology of the area and the interpretation of the bore hole cores, pits, trenches, reserves of marble and complete report of at least two representative samples indicating stone quality and suitability as per market requirements and the blocks proposed for mining operations.

FORM-B HALF YEARLY RETURN MINE/QUARRY CODE ………………..

(See rule 37(1)(a) For the half year ending …………………. 200

(i) Type of the marble worked:

(ii) Name(s) of other mineral(s), if any:

To, State Government concerned or any person so authorised under rule 47

1. Name and Location of the Quarry/mine Name of quarry/mine:

Village: Post Office: Taluka/Tehsil: District:

State:

2. Name and address of lessee/quarry/mine owner:

Name:

Address:

3. Lease Details Area in hectares: Date of Execution:

Period(years): Date of starting mining operations:

4. No. of days the quarry/mine worked during the half yearly period:

5. Indicate reason(s) for work stoppage Reasons No. of days due to strike, lockout, monsoon, non-availability of labour, less demand etc. and number of days of work stoppage for each of these factors.

6. Production, Despatches, Stocks and Pit's Mouth Value:

7. Production of Raw blocks, despatches, stocks and Pit's Mouth Value (Unit :

cu.m/tonnes):

________________________________________________________________________ Items Total Weight-wise/ Size-wise break up ________________________________________________________________________ a) Opening Stock b) Production c) Despatches

(i) Direct Exports

(ii) Domestic sale d) Closing stock e) Pit's Mouth Value(Rs.)

________________________________________________________________________

7.1 Waste and Rejects (Unit : Cu.M/tonnes) ________________________________________________________________________ Item During the half year ________________________________________________________________________

(a) Quantity of waste generated as overburden

(b) Quantity of waste generated incidental to mining of raw blocks

(c) Quantity of waste generated as rejected blocks and dressing rejects

(d) Despatches of waste and rejects (in accordance with above classification) ________________________________________________________________________

8. Mining Machinery used during the half yearly period ________________________________________________________________________ Type of Machinery No. of units Engine Horse Power of No. of hours each unit worked ________________________________________________________________________

(a)

(b)

(c)

(d) ________________________________________________________________________

9. Details of processing activity undertaken by the lessee , if any.

10. Export of Dimensional Blocks:

During the half yearly period:

Quantity (in MT): value (in Rs.):

11. Domestic Sale of Dimensional Blocks:

During the half yearly period:

Quantity (in MT): value (in Rs.):

12. Reasons for increase/decrease in production during the current half year as compared to the Preceding half year:

I certify that the information furnished above is correct and complete in all respects.

Place: Signature:

Date: Name in full:

Designation:Owner/Agent/Mining Engineer/Manager FORM-C ANNUAL RETURN (See rule 37(1)(b) MINE/QUARRY CODE ………………..

(For the year 1st April,200… to 31st March , 200….

(To be submitted before 1st July each year for the preceding year or within 90 days of the date of abandonment/surrender) i) Type of the marble worked:

ii) Name(s) of other mineral(s), if any:

To, State Government concerned or any person so authorised under rule 47

1. Name and Location of the quarry/mine:

Name of mine/quarry:

village: Post Office:

Taluka/Tehsil: District: State:

2. Name and Address of lessee/mine/quarry owner:

3. Lease Details Area in hectares: Date of Execution:

Period(years):

4. No. of days the quarry/mine worked during the year:

5. Indicate reason(s) for work stoppage Reasons No. of days due to strike, lockout, monsoon, non-availability of labour, less demand etc. and number of days of work stoppage for each of these factors.

6. Employment of Qualified Personnel and Labour:

6.1 Number of technical and supervisory staff:

________________________________________________________________________ Description Fully employed Partly employed ________________________________________________________________________ a. Graduate Mining Engineer b. Diploma Mining Engineer c. Geologist d. Other administrative, clerical and technical supervisory staff ________________________________________________________________________

6.2 Labour Employment : Male Female a. Average daily employment b. Wages (Rs.)

7. Production, Despatches, Stocks and Pit's Mouth Value:

7.1 Production of Raw sizes blocks during the year (Unit : Cu.M):

________________________________________________________________________ Items Total ________________________________________________________________________ a. Opening Stock b. Production c. Despatches

(i) Direct Exports

(ii) Domestic sale d. Closing stock e. Pit's Mouth Value(Rs.)

________________________________________________________________________

7.2 Cumulative Production:

(since opening of quarry/mine in Cu.M/tonnes)

7.3 Waste and Rejects (Unit : Cu.M/tonnes) ________________________________________________________________________ Item During the year Cumulative total ________________________________________________________________________ a) Quantity of waste generated as overburden b) Quantity of waste generated incidental to mining of raw blocks c) Quantity of waste generated as rejected blocks and dressing rejects d) Despatches of waste and rejects (in accordance with above classification) ________________________________________________________________________

8. Mining Machinery used during the year ________________________________________________________________________ Type of Machinery No. of units Engine Horse Power of No. of hours each unit worked ________________________________________________________________________

(a)

(b)

(c)

(d) ________________________________________________________________________

9. Reserves (proved, probable, possible) in-situ and recoverable:

10. Quantity and Cost of material consumed during the year Quantity Cost(Rs.)

(i) Fuel(Lt.):

(ii) Electricity (KWH)

(iii) Other Materials:

11. Amount of Rent and Royalty paid (Rs).

12. Annual production (last 3 years) (Quantity in cubic metres):

13. Exports (last 3 years) (Separately for dimensional blocks in tonnage )

14. Reasons for increase/decrease in production during the current year as compared to the preceding year:

I certify that the information furnished above is correct and complete in all respects.

Place: Name and Signature of Date: Owner/Agent/Mining Engineer/Manager ------------------------------------------------------------------------------------------------------------ Note:

(a) In case there is stoppage of work, indicate reasons for work stoppage and number of days of work stoppage.

(b) Average daily employment is obtained by dividing the number of man days worked by the number of working days.

(c) Wage includes all cash payments including bonuses. Employers' contributions to provident funds, welfare activities etc. Concessions in kind should not be included in wages

(d) The Pit's Mouth Value should represent the sale value of the marble at the pit head.

In case of sales effected on F.O.R or F.O.B or any other basis, pit head sale value should be arrived at after deducting all the expenses incurred from quarry/mine to railway station or port or other point of sale, as the case may be (such as expenses on transportation, loading and unloading charges, railway freight, sampling and analysis, port handling, export duty and cess).

(F.No.1/2/99-MVI) (S.P.GUPTA) JOINT SECRETRY TO THE GOVERNMENT OF INDIA.

Where this provision sits

ActMarble Development and Conservation Rules, 2002
Section47
Marginal noteDelegation of powers
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Marble Development and Conservation Rules, 2002 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.