The employer shall ensure at a construction site of a building or other construction work that,—
(a) The pressure plant and equipment—
(i) are examined and tested by the competent person before being put into use for such work;
(ii) is of proper design and construction, good quality material and adequate strength to perform the work for which it is used; and
(iii) is properly maintained in good repairs and working condition and its record is maintained ;
(b) the pressure plant and equipment, referred to in clause (a), is fitted with⎯
(i) a suitable safety valve or other effective device to provide maximum safe discharge pressure from being exceeded at any time;
(ii) a suitable pressure gauge with a dial range, not less than one point five times and not exceeding twice the maximum working pressure, easily visible and designed to show, at all times, the internal pressure in kilogram per square centimetre and marked with the maximum safe working pressure, is installed at such plant and equipment; and
(iii) a suitable stop valve or valves by which, the pressure plant or the system of the pressure plant may be isolated from the source of supply of pressure or otherwise;
(c) every pressure plant or equipment shall be thoroughly examined by the competent person⎯
(i) externally, once in every month ;
(ii) internally, once in every period of six months ; and
(iii) by hydraulic test once in a period of two years.
Section 40(2)
(j) 85
CHAPTER XVII SAFETY ORGANISATION