Section 189: Inspection and maintenance of pile-driving equipment
Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008State Rules of Punjab · 1996
The employer shall ensure at a construction site of a building or other construction work that,—
(a) pile-driving equipment is not taken into use until it has been inspected by a responsible engineer and found to be safe for such use;
(b) pile-driving equipment in use is inspected by a responsible engineer for such inspection at suitable intervals to ensure safety of the building worker, working on such equipment; and Sections 40 (2)
(q) and 62 Sections 40 (2)
(q) and 62 Sections 40 (2)
(q) and 62 Sections 40 (2)
(q) and 62 Sections 40 (2)
(q) and 62 95
(c) all pile lines and pulley blocks are inspected by a responsible engineer before the beginning of each shift of piling operation.
Need this as data, not as a page? Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.