Section 41: Ropes

Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008State Rules of Punjab · 1996

The employer shall ensure at a construction site of a building or other construction work that,—

(a) no rope is used for building or other construction work unless—

(i) it is of good quality and free from patent defects; and

(ii) in the case of a wire rope, it has been tested and examined by a competent person in the manner, specified in Schedule II;

(b) every wire rope of lifting appliance or lifting gears, used for building or other construction work, is inspected by a responsible person for such use, at least once in every three months :

Provided that after any such wire is broken in such a rope, it shall, thereafter, be inspected at least once in every month by the responsible person;

(c) no wire rope is used for building or other construction work, if in any length of eight diameters of such wire, the total number of visible broken wires exceed ten per cent of the total number of wires in such rope, or such rope shows sign of excessive wear, corrosion or other defects, which the person who inspects it or the Inspector having jurisdiction, declares it as unfit for use;

(d) eye splices and loops of ropes for the attachment of hooks, rings and other such parts to wire ropes are made with suitable thimble; and

(e) a thimble or loop splice made in any wire rope sling conforms to the following standards, namely :—

(i) wire rope sling shall have at least three tucks with full strand of rope and two tucks with one-half of the wires cut out of each of such strand in all cases and such strands shall be tucked against the layer of the ropes;

(ii) protruding ends of such strands in any splice of wire rope slings shall be covered or treated so as to leave no sharp points;

(iii) a fibre rope or a rope sling shall have at least four tucks;

tail of such tuck being whipped in a suitable manner; and

(iv) a synthetic fibre or rope sling shall have at least four tucks with full strand followed by further tuck with one-half Section 40 (2) (e) 31 filaments cut out of each of such strands. Any portion of the splices containing such tucks, with reduced number of filaments, shall be securely covered with suitable tape or other materials :

Provided that nothing contained in this sub-clause, shall apply, where any other form of splice, which may be shown to be as efficient as the splice with above standards, is used.

Where this provision sits

ActPunjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008
Section41
Marginal noteRopes
JurisdictionState of Punjab
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.