(1) The department in- charge of the allocation of land assignment shall be responsible for providing suitable land for setting up of the solid waste processing and treatment facilities and notify such sites by the State Government or Union territory Administration.
(2) The operator of the facility shall design and set up the facility as per the technical guidelines issued by the Central Pollution Control Board in this regard from time to time and the manual on solid waste management prepared by the Ministry of Urban Development.
62 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
(3) The operator of the facility shall obtain necessary approvals from the State Pollution Control Board or Pollution Control Committee.
(4) The State Pollution Control Board or Pollution Control Committee shall monitor the environment standards of the operation of the solid waste processing and treatment facilities.
(5) The operator of the facility shall be responsible for the safe and environmentally sound operations of the solid waste processing and or treatment facilities as per the guidelines issued by the Central Pollution Control Board from time to time and the Manual on Municipal Solid Waste Management published by the Ministry of Urban Development and updated from time to time.
(6) The operator of the solid waste processing and treatment facility shall submit annual report in Form III each year by 30 th April to the State Pollution Control Board or Pollution Committee and concerned local body.