(1) If the proposal for Building Permission is affected by any reservation of land for Public purpose such as Road, Park, Nala Widening, Recreational on any other public person, as per the sanctioned Master Plan I Detailed Town Planning Scheme I Local Area plan, the said portion of the land shall be surrendered to local body free of cost and the applicant shall be compensated by the equivalent built up area in the balance portion of the land or by Transferable Development Rights as prescribed.
(2) If the construction or reconstruction of any building is not completed within the specified period, the permission shall stand lapsed and a fresh application shall have to be made, duly paying revised charges, as prescribed.
(3) All buildings of all sizes should have on-site treatment systems (septic tank with soak away I twin leach pit / decentralized treatment system / faecal sludge and Preconditions for Building Permissions.
134 [Act No. 11 of 2019] septage) or connected to sewerage system, wastewater treatment and recycling system, as prescribed.
(4) Energy Conservation Building Code or Green Building Code or any other Energy and Water conservation measures as deemed appropriate by the State Government, shall be made applicable to buildings, as prescribed, on plots above certain size and/or built-up area beyond a certain area, as prescribed by the Government.
(5) Certain number of trees shall be planted in the open area in the plot where building is being constructed, as prescribed.
(6) It shall be mandatory to provide for the requisite parking place, while constructing, depending upon the use of building. Parking in buildings, places of public convenience, commercial complexes, cinema halls and other such places, as notified from time to time, shall be provided free of charge to the users, as prescribed.
(7) All parking places except individual independent I residential buildings shall be provided with Electric Vehicle Charging infrastructure.
(8) No external roof, veranda, wall of a building shall be constructed or reconstructed of grass, leaves, mats or other inflammable materials, except with the permission of the Commissioner.
(9) The Commissioner may revoke the Building permission whenever it is found that it was obtained by making false statement or misrepresentation of any material fact or violation of rules, by duly following the procedures, as prescribed.
[Act No. 11 of 2019] 135
177. The onus to ensure authenticity of self-declaration and compliance with the self-Certification lies with the owner, applicant and Licensed Technical Personnel. He/she will be held personally responsible and accountable in case of false declaration, the applicant and the Licensed Technical Personnel will be liable for punishment which includes imprisonment up-to three years, levy of penalty, demolition or taking over or sealing of the property without any notice besides cancelling the Licenses of License Technical Personnel (LTP) and forfeiting the mortgaged plots in case of layout or mortgaged built up area flats in case of buildings.