CourtMesh

Section 11: Eligibility to Participate under Renewable Energy Certificate Mechanism

Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018State Regulations of Bihar · 2003

The issuance of renewable energy certificate shall be as per the eligibility criteria specified under Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and subsequent amendments thereof;

12. Metering Arrangement

12.1 The metering system shall be as per the provisions of CEA (Installation & operation of meters) Regulations, 2006, CEA (Measures relating to Safety and electricity supply) Regulations, 2010 and CEA (technical standards for Connectivity of the distributed generation resources), Regulations, 2013 as amended from time to time and in compliance with the norms fixed by BERC/CERC from time to time.

12.2 The eligible consumer shall install Net/Gross Meter at the interconnection point of the eligible consumer with the network of distribution licensee. The eligible consumer shall also install solar meter at the delivery point of the solar energy system to measure the solar energy generated.

12.3 Check meters shall be mandatory for rooftop solar systems having capacity more than 20 kW. For installations size of less than and equal to 20 kW, the solar Check meters would be optional.

12.4 The Meter shall be tested, installed and sealed in accordance with the provisions of CEA (Installation and operation of Meters) Regulations, 2006 as amended from time to time and provisions under Bihar Electricity Supply Code, 2007 or any other relevant regulations in force.

It shall be jointly inspected and sealed by the licensee on behalf of both the parties. It shall be tested by the licensee and installed in presence of eligible consumer and the licensee with due acknowledgement.

Provided that the eligible consumer shall follow the metering specifications, provisions for placement of meter as developed by the distribution licensee from time to time and as per the Bihar Electricity Supply Code, 2007 or any other relevant regulations in force.

Provided further that in case the eligible consumer is under the ambit of Time of Day tariff, meters compliant of recording time of day consumption/generation shall be employed.

12.5 The meter reading, both net/gross meter and solar meter shall be taken by the distribution licensee and shall form the basis of commercial settlement. The copy of the meter reading statement shall be handed over to consumer as soon as meter reading is taken.

8 BIHAR GAZETTE (EXTRA) 3RD APRIL 2018

Where this provision sits

ActRooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018
Section11
Marginal noteEligibility to Participate under Renewable Energy Certificate Mechanism
JurisdictionState of Bihar
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.