Section 2: Definitions

Central Electricity Authority (Flexible Operation of Coal based Thermal Power Generating Units) Regulations, 2023Central Regulations · 2003

(1)In these regulations, unless the context otherwise requires,

(a) “Act” means the Electricity Act, 2003 (36 of 2003);

(b) “flexible operation” means the ability of coal based thermal power generating units to generate power at specified levels mentioned in these regulations, as per the requirement of the grid;

(c) “maximum continuous power rating” means maximum continuous output power expressed in Mega Watt at the generator terminals as guaranteed by the manufacturer of generating units at the rated parameters;

(d) “minimum power level” means the minimum output power expressed in percentage of maximum continuous power rating that the coal based thermal power generating unit can sustain continuously without oil support;

(e) “ramp rate” means the rate of change of output power, expressed in percentage of maximum continuous power rating, per minute.

(2) Words and expressions used herein and not defined but defined in the Act and the rules made thereunder shall have the meanings assigned to them in that Act and rules made thereunder.

3. Applicability.- These regulations shall apply to all coal based thermal power generating units owned or under control of the Central Government, State Governments or owned by any private company, connected with the grid and to the load despatch centers.

Where this provision sits

ActCentral Electricity Authority (Flexible Operation of Coal based Thermal Power Generating Units) Regulations, 2023
Section2
Marginal noteDefinitions
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Central Electricity Authority (Flexible Operation of Coal based Thermal Power Generating… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.