Central Electricity Authority (Grid Standards) Regulations, 2010Central Regulations · 2003
(1) All Entities shall set their underfrequency (UF) Relays and rate of change of frequency with time Relays in their respective systems, in accordance with the plan made by the Regional Power Committee, to provide adequate load relief for grid security and ensure the operation of these relays at the set frequencies.
(2) All constituents shall submit a detailed report of operation of these Relays at different frequencies to Regional Load Despatch Centre and Regional Power Committee on daily basis and the Regional Power Committees shall carry out inspection of these Relays as and when required.
Need this as data, not as a page? Central Electricity Authority (Grid Standards) Regulations, 2010 is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.