Section 2017: 82. Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017Union territory Regulations of Delhi · 2003

Notwithstanding anything to the contrary contained in Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005 and amendments thereof including the Orders made thereunder, the applicant/consumer shall be governed by the provisions of Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017.

83. Exemption:-

(1) The standards of performance specified in this Regulation shall remain suspended during Force Majeure conditions such as war, mutiny, civil commotion, riot, flood, cyclone, lightning, earthquake, lockout, fire, sabotage, blockade etc., affecting the Licensee’s installations and activities.

(2) Non-compliance of a standard contained in this Regulation shall not be treated as a violation, and the distribution licensee shall not be required to pay any compensation to affected consumer(s), if such violation is caused due to State Transmission Utility and/or Central Transmission Utility, grid failure, a fault on the Transmission Licensee’s network or on account of instructions given by State Load Dispatch Center, or any other reason, over which the distribution licensee has no reasonable control.

84. Issue of Order(s) and Practice Directions:- Subject to the provision of the Act and these Regulations, the Commission may from time to time, issue Order(s) and Practice directions in regard to the implementation of these Regulations and procedure to be followed on various matters, which the Commission has been empowered by these Regulations to direct, and matters incidental or ancillary thereto.

85. Power of relaxation and power to remove difficulties:-

(1) The Commission may, in public interest and for reasons to be recorded in writing, relax any of the provisions of these Regulations.

(2) If any difficulty arises in giving effect to the provisions of these regulations, the Commission may, by any general or special order, make such provisions, not inconsistent with the provisions of the Act, which appears to be necessary or expedient for the purpose of removing the difficulties.

86. Saving of Inherent Powers of the Commission:- Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the Commission from adopting a procedure, which is at variance with any of the provisions of these Regulations, if the Commission, in view of the special circumstances of the matter or class of matters and for reasons to be recorded in writing, deems it necessary or expedient to depart from the procedure specified in these Regulations.

87. Power to Amend:- The Commission may, at any time and on such terms as it may think fit, amend, alter or modify any provision of these Regulations or remove any error or defect in these Regulations. Any amendment/ alteration/modification Order in this regard except for rectification of a typographical error will clearly indicate reasons for amendment in writing.

106 DELHI GAZETTE : EXTRAORDINARY PART III]

88. Repeal and Savings

(1) Save as otherwise provided in these Regulations, the following Regulations issued by the Commission are hereby repealed:

(i) Delhi Electricity Supply Code & Performance Standards Regulations, 2007.

(ii) Delhi Electricity Regulatory Commission (Procedure for Filing Appeal before the Appellate Authority) Regulations, 2005.

(2) Notwithstanding such repeal, anything done or action taken or purported to have been taken, or proceedings initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the extent that same were not inconsistent with the Act.

SURENDRA EDUPGHANTI, Secy.

SCHEDULE-I GUARANTEED STANDARDS OF PERFORMANCE AND COMPENSATION TO CONSUMERS IN CASE OF DEFAULT Sl. No.

Service Area Standard Computation of period of default Compensation payable to consumer for the period of default in case of violation of standard

(1) (2) (3) (4) (5)

1. Connection where no Network augmentation is required Release of connection in electrified areas As per Regulation 11 From 8th day from the acceptance of application in case where no RoW or road cutting permission is required or From 15th day from the acceptance of application in case where RoW or road cutting permission is required, as the case may be.

1.5% of the demand charges deposited by consumer for each day of default.

2. Connection where Network augmentation is required

(i) Release of connection in Electrified Areas (where extension of line upto five poles is required) As per Regulation 11 From 16th day from the date of receipt of full payment against demand note.

1.5% of the demand charges deposited by consumer for each day of default

(ii) Release of connection in Electrified Areas (Where extension of lines or augmentation of Distribution Transformation capacity, where peak load of transformer has reached 90% of its rated capacity) As per Regulation 11 After 2 months from the date of receipt of full payment against demand note.

(iii) Release of connection in Electrified Areas (Where new Distribution Transformer is required) As per Regulation 11 After 4 months from the date of receipt of payment against demand note [PART III DELHI GAZETTE : EXTRAORDINARY 107

(iv) Release of connection in Electrified Areas (Where existing 11 kV network needs to be augmented) As per Regulation 11 After 6 months from the date of receipt of payment against demand note

(v) Release of connection in Electrified Areas (Where existing 66/33 kV grid substation needs to be augmented) As per Regulation 11 After 8 months from the date of receipt of payment against demand note

3. Connection in Un-electrified Areas

(i) Release of connection in Un-Electrified Areas (Where connection from nearby existing network is possible) As per Regulation 11 After 4 months from the date of receipt of payment against demand note.

1% of the amount deposited by developer/applicants per day of default.

(ii) Release of connection in Un-Electrified Areas/ Green Field Projects (Where new network is to be laid or grid station needs to be established) As per Regulation 11 After 12 months from the date of receipt of payment against demand note.

4. In case connection is denied after receipt of payment against demand note - - 1.5% of the demand charges deposited by consumer for each day of default subject to maximum of the amount paid as per demand note.

Default to be computed from the date of receipt of payment

5. Connection energized through loop As per Regulation 11 - Rs. 500 per kW of sanctioned/ contract demand

6. Transfer of name Within two billing cycles of acceptance of application or clearing of dues whichever is later From the next day of issuance of second bill.

Rs. 100 for each day of default.

7. Load reduction Within ten days of acceptance of application, shall be effective from next billing cycle From the 11th day of acceptance of application Rs. 100 for each day of default

8. If notice for downward revision if any is not sent By 31st May - Rs. 500 for each case

9. Change of category As per Regulation 17

(5) From the 8th day of receipt of application Rs. 100 for each day of default

10. Billing

(i) Error in billed amount Only one bill in a Financial Year Second and subsequent incorrect bill in a financial year 10% of excess amount billed

11. Meter complaints

(i) Replacement of defective meter Within fifteen days of declaring meter defective From 16th day of declaring meter defective Rs.50 for each day of default 108 DELHI GAZETTE : EXTRAORDINARY PART III]

12. Faults in Street light maintained by Licensee Rectification within seventy-two hours After lapse of 72 hours from the time consumer has made the complaint Rs. 75 for each day of default

13. Voltage fluctuation

(i) Local problem Resolution within four hours After lapse of 4 hours from the time consumer has made the complaint Rs. 50 for each day of default

(ii) Tap setting of transformer Resolution within twenty four hours After lapse of 24 hours from the time consumer has made the complaint Rs. 25 for each day of default

(iii) Repair of distribution line/ transformer/ capacitor Resolution within fifteen days After 15 days from the time consumer has made the complaint Rs. 100 for each day of default

(iv) Installation and Upgradation of HT / LT System Resolution within ninety days After 90 days from the time consumer has made the complaint

14. Power Supply Failure

(a) Compensation for power supply failure, standard for restoration and compensation payable for a consumer of sanctioned load or contract demand upto 20kW:

Sl.

No.

Service Area Standard for restoration of power supply for the Zone/ Subdivision having AT&C losses Computation of period of default Compensation payable to the consumer for the period of default in case of violation of standard Upto 10% More than 10% and Upto 20% More than 20%

(1) (2) (3) (4) (5) (6) (7)

(i) Continuous power failure affecting individual consumer and group of consumer upto 100 connected at Low voltage supply, excluding the failure where distribution transformer requires replacement.

Within three hours Within four hours Within six hours After lapse of period as specified in column (3), (4), (5) as the case may be from the time 1st consumer has made the complaint.

Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

(ii) Continuous power failure affecting more than 100 consumers connected at Low voltage supply excluding the failure where distribution transformer requires replacement.

Within two hours Within three hours Within four hours After lapse of period as specified in column (3), (4), (5) as the case may be from the time 1st consumer has made the complaint.

Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

(iii) Continuous power supply failure requiring replacement of distribution transformer.

Within six hours After lapse of 6 hours from the time consumer has made the complaint.

Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

[PART III DELHI GAZETTE : EXTRAORDINARY 109

(iv) Continuous power failure affecting consumers connected through High Voltage Distribution System (HVDS) and not covered under (i) &

(ii) above Within three hours After lapse of 3 hours from the time consumer has made the complaint.

Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

(v) Continuous scheduled power outages Within 12 hours or restoration of power supply by 6PM From the lapse of 12 hours from the scheduled start of maintenance or after 6PM of the day whichever is earlier.

Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

(vi) Replacement of burnt meter or stolen meter Restoration of supply within three hours either by bypassing the burnt meter or by installing temporary meter.

After lapse of 3 hours from the time consumer has made the complaint Rs. 10 per kW per hour of sanctioned load or contract demand, as the case may be, subject to maximum of Rs.200 per hour per consumer.

(vii) Meter to be replaced within three days After lapse of 3 days from the time consumer has made the complaint Rs.50 for each day of default

(b) Any consumer having sanctioned load or contract demand above 20kW, affected continuously by the power supply failure as above, may approach the Commission for determination of the compensation.

(c) The Licensee shall upload on its website the AT&C losses for the zone / sub-division for the preceding financial year by 15th of April of the year.

(d) Any claim arising on account of power failure shall not be admissible for those consumers who have outstanding dues upto preceding billing cycle, or have been, during last two years, convicted for theft of electricity or finally assessed for Unauthorised Use of Electricity.

Note:

(i) For the purpose of determination of compensation to the consumer in case of violation of standard, the days beyond the standard for period of default shall be taken as calendar days.

(ii) Where the compensation payable has been specified based on default in days and the default is part of the day, the compensation shall be payable for the whole day.

110 DELHI GAZETTE : EXTRAORDINARY PART III]

SCHEDULE-II Overall Standards of Performance

1. Power Supply Failure: The Licensee shall maintain the percentage of Power Supply Failures rectified within the time limits prescribed under Schedule-I to total calls received not less than 95%.

2. Scheduled outages: Interruption in power supply due to scheduled outages, other than the load-shedding, has to be notified in advance and shall not exceed twelve hours in a day and in each such event, the Licensee has to ensure that the supply is restored by 6:00PM. The Licensee shall achieve both of these standards of performance in at least 95% of the cases.

3. Reliability Indices

(1) The Licensee shall calculate the reliability of its distribution system on the basis of number and duration of sustained interruptions in a reporting period, using the following indices:

(i) System Average Interruption Frequency Index (SAIFI) which means the average frequency of sustained interruptions per consumer occurring during the reporting period, determined by dividing number of consumers who have experienced a sustained interruption by the total number of consumers.

(ii) System Average Interruption Duration Index (SAIDI) which means the average duration of sustained interruptions per consumer occurring during the reporting period, determined by dividing the sum of all sustained consumer interruptions durations, in minutes, by the total number of consumers ;and

(iii) Customer Average Interruption Duration Index (CAIDI) which means the average interruption duration of sustained interruptions for those consumers who experienced interruptions during the reporting period, determined by dividing the sum of all sustained consumer interruption durations, in minutes, by the total number of interrupted consumers for the reporting period, or by using the equation: CAIDI = SAIDI / SAIFI ;

(2) The Licensee while calculating the above indices, shall not take into account the following types of interruptions:

(i) Scheduled outages;

(ii) Momentary outages of a duration not more than five minutes;

(iii) Outages due to the failure of the grid ;

(iv) Outages due to the reasons described in Force Majeure conditions.

(3) Method of computing Reliability Indices

(i) System Average Interruption Duration Index (SAIDI) = It is average duration of sustained interruptions per consumer.

SAIDI=∑ ri x Ni / Nt

(ii) System Average Interruption Frequency Index (SAIFI) = It is average frequency of sustained interruptions per consumer.

SAIFI =∑Ni / Nt Where;

[PART III DELHI GAZETTE : EXTRAORDINARY 111 i = an interruption event;

ri = restoration time for each interruption event;

Ni= number of consumers who have experienced a sustained interruption during the reporting period; and Nt = total number of consumers of Licensee

(iii) Customer Average Interruption Duration Index (CAIDI) = It is average interruption duration of sustained interruptions for those consumers who had experienced interruptions. CAIDI = SAIDI/SAIFI.

(4) The Licensee shall propose the target level of these indices annually while submitting ARR. The Commission would accordingly notify these indices.

4. Frequency variations: The Licensee shall achieve coordination with other network constituents such as State Transmission Utility, State Load Dispatch Center, distribution Licensees and other transmission Licensees in an endeavor to maintain the supply frequency as per the Indian Electricity Grid Code as amended from time to time.

5. Voltage Imbalance: The Licensee shall ensure that the voltage Imbalance does not exceed 3% at the point of commencement of supply. Voltage Imbalance shall be computed in a manner to be notified by the Commission separately. The Licensee shall submit an exception report to the Commission giving details of the instances when the voltage was beyond the permissible limit at the distribution transformer level.

6. Billing mistakes: The Licensee shall maintain the percentage of bills requiring modifications based on consumer complaints to the total number of bills issued, not greater than 0.2%.

7. Electrical accidents:

The Licensee shall endeavour to avoid any electrical accident. Increase or decrease in number of electrical accidents compared over a period of time will also be an indicator of the Licensee’s performance.

The Summary of Overall performance standards is as follows:

Service area Overall Standard of Performance Power Supply Failure At least 95% calls received should be rectified within prescribed time limits Scheduled outage At least 95% of cases resolved within time limit Faults in Street Light maintained by Licensee At least 90% cases should be complied within prescribed time limits Reliability Indices SAIFI To be laid down by the Commission based on the targets proposed by the Licensees. SAIDI CAIDI Frequency variations To maintain supply frequency within range as per IEGC.

Voltage Imbalance Maximum of 3% at point of commencement of supply Percentage billing mistakes Shall not exceed 0.2% 112 DELHI GAZETTE : EXTRAORDINARY PART III] Appendix-I Formula for assessment of energy in case of unauthorized use of electricity or theft of electricity

(1) For the purpose of assessment, connected load on the date of inspection, shall be computed as under:- “Connected load” means aggregate of the manufacture’s rating of all energy consuming devices in the consumer’s premises, which can be simultaneously used. This shall not include the load of spare plug, sockets, load exclusively installed for firefighting purposes. Only heating or cooling apparatus shall be taken into account as per prevailing season (1st April to 30th September for cooling use and 1st October to 31st March for heating use).

(2) Assessment of energy shall be done based on the following formula:

Units assessed = L x D x H x F, where

(i) L is the connected load (in kW or kVA as per applicable tariff) on the date of inspection.

(ii) D is number of days for assessment period.

(iii) H is use of supply hours per day, which shall be taken for different categories of use as below :

a) Single shift industry (day / night only) 10 hrs.

b) Non-continuous process industry (day and night) 20 hrs.

c) Continuous process industry 24 hrs.

d) Non-domestic (general) including restaurants 11 hrs.

e) Hotels, hospitals, nursing homes, guest houses, petrol pumps 20 hrs.

f) Domestic 8 hrs.

g) Agriculture 10 hrs.

h) Temporary Connections 12 hrs.

i) Any other category not mentioned above 13 hrs.

(iv) F is load factor, which shall be taken for different categories of use as below :

a) industrial 60% b) non-domestic 60% c) domestic 40% d) agriculture 50% e) direct theft 100% f) temporary connections 100% i) Any other category not mentioned above 60%

(3) The hours for the purpose of assessment in the cases of bonafide domestic use shall not be considered more than one hour per day on 100% load factor for domestic water pump, microwave oven, washing machines and petty domestic appliances.

SURENDRA EDUPGHANTI, Secy.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

6253 DG/2017 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 7] fnYyh] lkseokj] vDrwcj 16] 2017@vkf'ou 24] 1939 ¹jk-jk-jk-{ks-fn- la- 289 No. 7] DELHI, MONDAY, OCTOBER 16, 2017/ASVINA 24, 1939 [N.C.T.D. No. 289 Hkkx—III

PART—III jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI fnYyh fo|qr fofu;ked vk;ksxfnYyh fo|qr fofu;ked vk;ksxfnYyh fo|qr fofu;ked vk;ksxfnYyh fo|qr fofu;ked vk;ksx 'kqf)i='kqf)i='kqf)i='kqf)i= fnYyh] 13 vDrwcj] 2017 No. F. 17(85)/Engg./DERC/2015-16/C.F. No. 5109/1428.—fnYyh fo|qr fofu;ked vk;ksx ¼vkiwÆr dksM rFkk fu"iknu ekud½ fofu;e] 2017] ,ulhVhMh ua- 218] fnukafdr 17&08&2017 dks fnYyh jkti= vlk/kkj.k Hkkx&III] }kjk vf/klwfpr fd;k x;k gSA

2. bl fofu;e ds vaxzsth laLdj.k esa dqN folaxfr;ka ikbZ xbZ gSa ftUgsa fuEufyf[kr 'kqf)i= ds }kjk lq/kkj djus dh vko';drk gS:

i. पृ� 68 म� िविनयम 11(4)(i)(d), तािलका म� �म सं�या (v) म� िन�िलिखत िविनयम;

(v) Release of connection, where no RoW or road cutting permission is required Within 1 day of receipt of payment को पढ़ा जाये

(v) Release of connection, where no RoW or road cutting permission is required Within 1 day of receipt of payment Release of connection, where RoW or road cutting permission is required Within 9 days of receipt of payment ii. पृ� 104 म� िविनयमन 77 म� �म सं�या (3) के बाद �म सं�या (1) और (2) को, �म सं�या (4) और (5) पढ़ा जाये | iii. पृ� 112 म� Appendix-I, तािलका म� िन�िलिखत �म सं�या (2) (iii);

2 DELHI GAZETTE : EXTRAORDINARY PART III] i) Any other category not mentioned above 13 hrs.

को पढ़ा जाये i) Any other category not mentioned above 12 hrs.

3. ;g 'kqf)i= vk;ksx ds vuqeksnu ij tkjh fd;k x;k gSA lqjsaanzk bMqi?kaVh] lfpo DELHI ELECTRICITY REGULATORY COMMISSION CORRIGENDUM Delhi, the 13th October, 2017 No. F. 17(85)/Engg./DERC/15-16/C.F. No. 5109/1428.—Whereas Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, have been notified vide Delhi Gazette Extraordinary Part-III dated 17-08-2017, NCTD No. 218.

2. Whereas certain discrepancies have been observed in the English version of the said Regulations, which need to be rectified by issuing following corrigendum:

i. At page 68 under Regulation 11(4)(i)(d) at Serial No. (v) of the table insert as under For

(v) Release of connection, where no RoW or road cutting permission is required Within 1 day of receipt of payment Read

(v) Release of connection, where no RoW or road cutting permission is required Within 1 day of receipt of payment Release of connection, where RoW or road cutting permission is required Within 9 days of receipt of payment ii. At page No. 104 under Regulation 77 after Serial No. (3) for Serial No. (1) & (2) read Serial No. (4) & (5).

iii. At page 112 under Appendix-I at Serial No. (2) (iii) of the table:

For i) Any other category not mentioned above 13 hrs.

Read i) Any other category not mentioned above 12 hrs.

3. This Corrigendum is issued with the approval of the Commission.

SURENDRA EDUPGHANTI, Secy.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

917 DG/2018 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 1] fnYyh] 'kqØokj] Qjojh 16] 2018@ek?k 27] 1939 ¹jk-jk-jk-{ks-fn- la- 447 No. 1] DELHI, FRIDAY, FEBRUARY 16, 2018/MAGHA 27, 1939 [N.C.T.D. No. 447 Hkkx—III

PART—III jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI fnYyh fo|qr fofu;ked vk;ksx vf/lwpuk fnYyh] 15 Qjojh] 2018 [fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼çFke la'kks/ku½ fofu;e] 2018] la- ,Q-17 ¼85½@MhbZvkjlh@baft-@2017&18@5855@2661-& fnYyh fo|qr fofu;ked vk;ksx }kjk ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fØ;kUo;u esa vf/kd Li"Vrk vkSj lqxerk ykus ds fy,] fnYyh fo|qr fofu;ked vk;ksx] fnYyh fo|qr fu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fofu;e 87 }kjk çnÙk 'kfDr;ksa vkSj fiNys çdk'ku ds ckn ,oa mlds fufeÙk l{ke djus dh vU; lHkh 'kfä;ksa dk ç;ksx djrs gq,] ,rn~ }kjk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2018 ¼blds ckn ^^çeq[k fofu;e** dgk tk,xk½ ds fuEufyf[kr fofu;eksa esa la'kks/ku fd;k tkrk gS% 1-0 y?kq 'kh"kZd rFkk izkjaHku%

(1) bu fu;eksa dks fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼çFke la'kks/ku½ fofu;e] 2018 dgk tk ldrk gSA

(2) ;s fofu;e vkf/kdkfjd jkti= esa vius çdk'ku dh frfFk ls çHkkoh gksaxsA 2-0 çeq[k fofu;eksa ds fofu;e 2 ds mi&fofu;e ¼28½ esa la'kks/ku% çeq[k fofu;eksa ds fofu;e 2 ds mi&fofu;e ¼28½ dh vafre iafä esa ls] ^fdlh Hkh fcfyax pØ ;k fcfyax vof/k* 'kCnksa dks gVk fn;k tk,xkA 3-0 çeq[k fofu;eksa ds fu;eu 4 ds mi&fofu;e ¼2½ ¼i½ esa la'kks/ku% 2 DELHI GAZETTE : EXTRAORDINARY PART III] çeq[k fofu;eksa ds fofu;e 4 ds mi&fofu;e ¼2½ ¼i½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk%& “(i) de ruko ¼,yVh½

(a) flaxy Qst% Qst vkSj U;wVªy ds chp 230@240 oksYVA

(b) rhu Qst% Qstksa ds chp 400@415 oksYVA** 4-0 çeq[k fofu;eksa ds fofu;eu 7 ds mi&fu;eu ¼5½ esa la'kks/ku% çeq[k fofu;eksa ds fofu;e 7 esa] mi&fofu;e ¼5½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk] vFkkZr~% “(5) 2 fdyksokV vkSj mlls Åij ds Hkkj dh eatwjh çkIr djus okys lHkh miHkksäk] vk;ksx }kjk vf/klwfpr le; ds Hkhrj vfFkaZx ds fjlko laj{k.k ds fy, ,d mi;qä midj.k LFkkfir djsaxs% c'krZsa fd tc rd mi;qä vfFkaZx fjlko lqj{kk midj.k LFkkfir ugha fd;k x;k gks] 2 fdyksokV vkSj mlls Åij ds Loh—r Hkkj ds Åij dk dksbZ u;k dusD'ku fØ;k'khy ugha fd;k tk,xkA**” 5-0 çeq[k fofu;eksa ds fofu;e 16 ds mi&fofu;e ¼9½ esa la'kks/ku%

(1) çeq[k fofu;eksa ds fofu;e 16 ds mi&fofu;e ¼9½ ¼i½ ds ckn] fuEufyf[kr çko/kku lfEefyr fd, tk,axs% ^^c'krZsa fd ;fn ehVj }kjk ntZ dh xbZ vf/kdre ekax fjfMax LohÑr Hkkj ls vf/kd gS] rks vLFkk;h dusD'ku dh vof/k ds nkSjku ehVj }kjk ntZ vf/kdre ekax fjfMax ds vuqlkj] miHkksX;ksa] okil ugha fd, tk ldus okys midj.kksa vkfn ds fy, ,d ckj fn;k tkus okyk xSj&okilh ;ksX; 'kqYd ns; gksxkA**

(2) çeq[k fofu;eksa ds fofu;e 16 esa] mi&fofu;e ¼9½ ¼iii½ ds çko/kkuksa dh vafre iafä esa] 'kCn vkSj la[;k ^12 ?kaVs* dks 'kCn vkSj la[;k ^18 ?kaVs* ls çfrLFkkfir fd;k tk,xkA 6-0 çeq[k fofu;eksa ds fofu;e 17 ds mi&fofu;e ¼7½ ¼ii½ esa la'kks/ku çeq[k fofu;eksa ds fofu;e 17 esa] mi&fofu;e ¼7½ ¼ii½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk] vFkkZr~% “(ii) vkiwfrZ ç.kkyh ds ekStwnk oxhZdj.k vkSj fufnZ"V 'kqYd dk Hkqxrku dk :ikarj.k vk;ksx ds vkns'kksa ds vuqlkj fufnZ"V rjhds ls fd;k tk,xkA**” 7-0 çeq[k fofu;eksa ds fofu;e 29 esa la'kks/ku% çeq[k fofu;eksa ds fofu;e 29 ds mi&fofu;e ¼8½] ¼9½] ¼10½] ¼11½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk] vFkkZr~% ^^¼8½ vfxze lwpuk nsus ds ckn] vkosnd@miHkksäk ;k mlds vf/k—r çfrfuf/k dh mifLFkfr esa] ykblsal/kkjh] u, dusD'ku tkjh djus ds fy, fufnZ"V le; ds Hkhrj] ;k ehVj ds çfrLFkkiu ds fy, fufnZ"V le; ds Hkhrj ehVj LFkkfir djsxk% c'krsZ fd ehVj ds çfrLFkkiu ds ekeys esa] forj.k ykblsal/kkjh miHkksäk dks de ls de 3 ¼rhu½ fnu igys lwpuk nsA ¼9½ tc Hkh u, dusD'ku ;k çfrLFkkiu ;k fctyh dh vkiwfrZ dh cgkyh ;k fdlh vU; dke ds ds fy,] dksbZ ehVj can fd;k tkrk gS] rks mls miHkksäk ;k mlds vf/k—r çfrfuf/k dh mifLFkfr esa can fd;k tk,xkA ¼10½ fdlh Hkh ehVj dks yxkus ;k ehVj dks lhy djus ds le;] ykblsal/kkjh }kjk vk;ksx }kjk vuqeksfnr çk:i ¼ehVj fooj.k i=½ esa eqgj ds fooj.k lfgr ehVj dk fooj.k ntZ fd;k tk,xkA ¼11½ ykblsal/kkjh] ehVj fooj.k i= dh ykblsal/kkjh vkSj vkosnd ;k muds vf/k—r çfrfuf/k;ksa }kjk mfpr :i ls gLrk{kfjr ,d çfr vkosnd ;k muds vf/k—r çfrfuf/k;ksa dks nsxk vkSj ikorh ds :i esa ,slh ,d çfr vius ikl j[ksxk% c'krZsa sZ fd forj.k ykblsal/kkjh ds ikl LFkkiuk lkbV ij miHkksäk ds gLrk{kj lfgr ehVj ds fooj.k dks fMftVy :i ls fjd‚MZ djus dk fodYi gks% [PART III DELHI GAZETTE : EXTRAORDINARY 3 c'krZsa fd ml vkosnd ds fy,] ftlus vkosnu i= esa bZesy vkbZMh çnku dh gS] ykblsal/kkjh fooj.k i= dh çfr vkosnd dks bZesy tSls bysDVª‚fud eksM ds ek/;e ls Hkst nsxk% c'krZsa fd ;fn ehVj fooj.k i= vkosnd dks bysDVª‚fud eksM ds ek/;e ls Hkstk tkrk gS] rks ehVj fooj.k i= dh gkMZ d‚ih dsoy vkosnd ds vuqjks/k ij gh Hksth tk,xhA** 8-0 çeq[k fofu;eksa ds fofu;e 32 esa la'kks/ku%

(1) çeq[k fofu;eksa ds fofu;e 32 esa] mi&fofu;e ¼2½ ¼i½ ds nwljs çko/kku dh rhljh iafä esa] ^}kjk* 'kCn dks ^esa* 'kCn ls çfrLFkkfir fd;k tk,xkA

(2) çeq[k fofu;eksa ds fofu;e 32 ds fy, mi&fofu;e ¼8½ ¼i½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk] vFkkZr~% ^^¼8½ NsM+NkM+ fd, tkus okys lafnX/k ehVj dk ijh{k.k%&

(i) ;fn ykblsal/kkjh dks fctyh dh pksjh ;k ehVj ds ek/;e ls fctyh ds vuf/k—r mi;ksx dk lansg gS] rks ml ç;kstu ds fy, ehVj dks vk;ksx }kjk vf/klwfpr fdlh ekU;rkçkIr ç;ksx'kkyk ;k vk;ksx }kjk vf/klwfpr fdlh vU; ,tsalh esa tkap dh tk,xh% c'krZsa fd vk;ksx }kjk vf/klwfpr ekU;rkçkIr ç;ksx'kkyk dh vuqifLFkfr esa] ykblsal/kkjh }kjk LFkkfir ç;ksx'kkyk ds vykok fdlh vU; ekU;rk çkIr ç;ksx'kkyk esa ehVj dk ijh{k.k fd;k tk,xkA** egsUæz flag] lfpo uksV% çeq[k fofu;e 17 vxLr] 2017 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- la[;k 218 esa çdkf'kr fd, x, FksA DELHI ELECTRICITY REGULATORY COMMISSION NOTIFICATION Delhi, the 15 th February, 2018 [Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (First Amendment) Regulations, 2018] No. F.17(85)/DERC/Engg./2017-18/5855/2661.— In order to bring more clarity and ease in implementation of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, the Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Regulation 87 of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 and all other powers enabling it in this behalf and after previous publication, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2018 (hereinafter referred to as “the Principal Regulations”):

1.0 Short title and commencement:

(1) These regulations may be called the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (First Amendment) Regulations, 2018.

(2) These regulations shall come into effect from the date of their publication in the official Gazette.

2.0 Amendment of sub-Regulation (28) of Regulation 2 of Principal Regulations:

In regulation 2 of Principal Regulations, in the last line of sub-Regulation (28), the words ‘in any billing cycle or billing period’ shall be omitted.

4 DELHI GAZETTE : EXTRAORDINARY PART III]

3.0 Amendment of sub-Regulation (2) (i) of Regulation 4 of Principal Regulations:

In regulation 4 of Principal Regulations, for sub-Regulation (2) (i), the following shall be substituted namely:- “(i) Low Tension (LT)

(a) Single Phase: 230/240 volts between phase and neutral.

(b) Three Phase: 400/415 volts between phases.”

4.0 Amendment of sub-Regulation (5) of Regulation 7 of Principal Regulations:

In regulation 7 of Principal Regulations, for sub-Regulation (5) the following shall be substituted namely:

“(5) All consumers having sanctioned load of 2kW and above, shall install a suitable device for earth leakage protection within the time period as may be notified by the Commission:

Provided that no new connection of 2kW and above of sanctioned load shall be energized, unless a suitable earth leakage protective device has been installed.”

5.0 Amendment of sub-Regulation (9) of Regulation 16 of Principal Regulations:

(1) In Regulation 16 of Principal Regulations, after sub-Regulation (9)(i), the following proviso shall be inserted:

“Provided that in case if the maximum demand reading recorded by the meter is more than the sanctioned load, onetime non-refundable charges for consumables, non-retrieval of equipment, etc. shall be payable as per maximum demand reading recorded by the meter during the period of temporary connection.”

(2) In Regulation 16 of Principal Regulations, in the last line of proviso of sub-Regulation (9)(iii), for the word and figure ‘18 hours’ , the word and figure ‘12 hours’ shall be substituted.

6.0 Amendment of sub-Regulation (7)(ii) of Regulation 17 of Principal Regulations:

In Regulation 17 of Principal Regulations, for sub-Regulation (7)(ii) the following shall be substituted namely:

“(ii) Conversion of existing classification of system of supply shall be carried out in the manner and on payment of charges as may be specified in the Commission’s Orders.”

7.0 Amendment of Regulation 29 of Principal Regulations:

In Regulation 29 of Principal Regulations, for sub-Regulations (8), (9), (10), (11), the following shall be substituted namely:

“(8) The Licensee shall install the meter, within the time specified for release of new connection or the time specified for replacement of meters as the case may be, in the presence of the applicant/consumer or his authorized representative after giving advance notice:

Provided that in case of replacement of meter, the distribution licensee shall give atleast 3 (three) days advance notice to the consumer.

(9) Whenever a meter is sealed, either for a new connection or replacement or restoration of power supply or any other work, it shall be sealed in the presence of the consumer or his authorized representative.

(10) At the time of installation of any meter or sealing of meter, the Licensee shall record the particulars of the meters including the details of seals in a format (meter particulars sheet) approved by the Commission.

(11) The Licensee shall give a copy of the meter particulars sheet to the applicant or their authorized representatives, duly signed by the Licensee and the applicant or their authorized representatives, and retain one such copy as an acknowledgment:

Provided that the distribution licensee may have the option to record the particulars of the meter digitally including the signature of the consumer at installation site itself:

Provided further that for the applicant who has provided email ID in the application form, the Licensee shall send the copy of meter particulars sheet to the applicant through electronic mode such as email:

[PART III DELHI GAZETTE : EXTRAORDINARY 5

Provided also that if the meter particulars sheet is sent to the applicant through electronic mode, the hard copy of meter particulars sheet shall only be delivered on the request of the applicant.”

8.0 Amendment of Regulation 32 of Principal Regulations:

(1) In Regulation 32 of Principal Regulations, in the third line of second proviso of sub-Regulation (2) (i), for the word ‘in’, the word ‘by’ shall be substituted.

(2) In Regulation 32 of Principal Regulations, for sub-Regulation (8) (i), the following shall be substituted namely:

“(8) Testing of suspected tampered meter:-

(i) If the Licensee suspects theft of electricity or unauthorised use of electricity through a meter or through a burnt meter, the meter shall be tested in an accredited laboratory notified by the Commission for that purpose or at any other agency as may be notified by the Commission:

Provided further that in the absence of an accredited laboratory notified by the Commission, the meter shall be tested in any accredited laboratory other than that of the Licensee.” MAHENDER SINGH, Secy.

Note: The Principal Regulations were published on 17 th August, 2017 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 218.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

1330 DG/2018 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 2] fnYyh] c``gLifrokj] ekpZ 8] 2018@ek?k 17] 1939 ¹jk-jk-jk-{ks-fn- la- 461 No. 2] DELHI, THURSDAYT, MARCH 8, 2018/PHALGUNA 17, 1939 [N.C.T.D. No. 461 Hkkx—III

PART—III jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI —————— fnYyh fo|qr fofu;ked vk;ksx 'kqf)&i= fnYyh] 7 ekpZ 2018 la- ,Q-17¼85½@MhbZvkjlh@baft-@2017&18@5855@2807—fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼çFke la'kks/ku½ fofu;e] 2018] ,ulhVhMh ua- 447 fnukafdr 16&02&2018 dks fnYyh jkti= vlk/kkj.k Hkkx& III] }kjk vf/klwfpr fd;k x;k gSA

2. bl fofu;e esa folaxfr;ka ikbZ xbZ gSa ftUgsa fuEufyf[kr 'kqf)i= ds }kjk lq/kkj djus dh vko';drk gS:

प�ृ 1 igyk vuqPNsn esa : la-,Q-17¼85½@MhbZvkjlh@baft-@2017&18@5855@2661& fnYyh fo|qr fofu;ked vk;ksx }kjk ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fØ;kUo;u esa vf/kd Li"Vrk vkSj lqxerk ykus ds fy,] fnYyh fo|qr fofu;ked vk;ksx] fnYyh fo|qr fu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fofu;e 87 }kjk çnÙk 'kfDr;ksa vkSj fiNys çdk'ku ds ckn ,oa mlds fufeÙk l{ke djus dh vU; lHkh 'kfä;ksa dk ç;ksx djrs gq,] ,rn~ }kjk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2018 ¼blds ckn ^^çeq[k fofu;e** dgk tk,xk½ ds fuEufyf[kr fofu;eksa esa la'kks/ku fd;k tkrk gS% dks i<+k tk;s : la- ,Q-17 ¼85½@MhbZvkjlh@baft-@2017&18@5855@2661& fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fØ;kUo;u esa vf/kd Li"Vrk vkSj lqxerk ykus ds fy,] fnYyh fo|qr fofu;ked vk;ksx] fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ds fofu;e 87 }kjk çnÙk 'kfDr;ksa vkSj fiNys çdk'ku ds ckn ,oa mlds fufeÙk l{ke djus dh vU; lHkh 'kfä;ksa dk ç;ksx djrs gq,] ,rn~ }kjk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ¼blds ckn ^^çeq[k fofu;e** dgk tk,xk½ ds fuEufyf[kr fofu;eksa esa la'kks/ku fd;k tkrk gS% 3 ;g 'kqf)i= vk;ksx ds vuqeksnu ij tkjh fd;k x;k gSA lqjsaanzk bMqi?kaVh] lfpo 2 DELHI GAZETTE : EXTRAORDINARY PART III] DELHI ELECTRICITY REGULATORY COMMISSION CORRIGENDUM Delhi, the 7 th March, 2018 No. F.17(85)/DERC/Engg./2017-18/5855/2807—Whereas Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (First Amendment) Regulations, 2018, have been notified vide Delhi Gazette Extraordinary Part-III dated 16-02-2018, NCTD No. 447.

2. Whereas certain discrepancies have been observed the said Regulations, which need to be rectified by issuing following corrigendum:

At Page 1 in the First Paragraph:

For : “No. F.17(85)/DERC/Engg./2017-18/5855/2661 – In order to bring more clarity and ease in implementation of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, the Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Regulation 87 of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 and all other powers enabling it in this behalf and after previous publication, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2018 (hereinafter referred to as “the Principal Regulations”):

Read: “No. F.17(85)/DERC/Engg./2017-18/5855/2661 – In order to bring more clarity and ease in implementation of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, the Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Regulation 87 of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 and all other powers enabling it in this behalf and after previous publication, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 (hereinafter referred to as “the Principal Regulations”):

3. This Corrigendum issued with the approval of the Commission.

SURENDRA EDUPGHANTI, Secy.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

6092 DG/2018 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 10] fnYyh] lkseokj] vDrwcj 15] 2018@vkf'ou 23] 1940 ¹jk-jk-jk-{ks-fn- la- 633 No. 10] DELHI, MONDAY, OCTOBER 15, 2018/ASVINA 23, 1940 [N.C.T.D. No. 633 Hkkx—III

PART—III —————— jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI ————————— fnYyh fo|qr fofu;ked vk;ksx vf/klwpuk fnYyh] 12 vDrwcj] 2018 fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼f}rh; la'kks/ku½ fofu;e] 2018 la- ,Q- 17¼85½MhbZvkjlh@bath-2017-18@5855@2680-&jk"Vªh; jkt/kkuh {ks= fnYyh ljdkj ls fo|qr vf/kfu;e] 2003 dh /kkjk 108 ds v/khu izkIr funsZ'kksa ds vuqlj.k esa rFkk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 dks ykxw djus esa vf/kd Li"Vrk rFkk vklkuh ds fy,] fo|qr vf/kfu;e] 2003 ¼2003 ds vf/kfu;e 36½ dh /kkjk 46] 50 ds lkFk ifBr /kkjk 57] 181 }kjk iznÙk 'kfDr;kas rFkk fiNys izdk'ku ds i'pkr bl laca/k esa bldks l{ke cukus okyh vU; lHkh 'kfDr;ksa dk iz;ksx djrs gq,] ,rn~}kjk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ¼blds i'pkr ^^izeq[k fofu;e^^ ds :i esa mfYyf[kr½ ds fuEufyf[kr fofu;eksa esa la'kks/ku fd;k tkrk gS%& 1-0 y?kq 'kh"kZd vkSj izkjaHku

(1) bu fofu;eksa dks fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼f}rh; la'kks/ku½ fofu;e] 2018 dgk tk,A

(2) ;s fofu;e vkf/kdkfjd jkti= esa viuss izdk'ku dh frfFk ls izHkkoh gksaxsA 2-0 izeq[k fofu;eksa ds fofu;e 20 esa la'kks/ku%

(1) izeq[k fofu;eksa ds fofu;e 20 esa] mi&fofu;e ¼1½ ds f}rh; ijarqd esa] 'kCn vkSj vad ^1,eoh,* ds LFkku ij 'kCn vkSj vad ^100dsMCY;w* çfrLFkkfir fd;k tk,xkA 2 DELHI GAZETTE : EXTRAORDINARY PART III]

(2) izeq[k fofu;eksa ds fofu;e 20 ds mi&fofu;e ¼7½ dks fuEukuqlkj çfrLFkkfir fd;k tk,xk% ^^¼7½ dusD'ku ds gLrkarj.k ds ekeys esa] iwoZorhZ miHkksDrk ds uke ij izfrHkwfr tek vkosnd ds uke ij LFkkukarfjr dj nh tk,xh vkSj dksbZ vfrfjä izfrHkwfr tek ugha yh tk,xh**

(3) izeq[k fofu;eksa ds fofu;e 20 ds mi&fofu;e ¼8½ dks fuEukuqlkj çfrLFkkfir fd;k tk,xk% ^^¼8½ miHkksDrk ds Loh—r Hkkj ;k vuqca/k dh ekax ds m/oZxkeh ¼vioMZ½ la'kks/ku ds ekeys esa] miHkksDrk] of̀) dh frfFk ij izfrHkwfr tek dh ekStwnk njksa ij vfrfjä Hkkj ds vuq:i vfrfjä izfrHkwfr tek dk Hkqxrku djus ds fy, mÙkjnk;h gksxkA** ¿Li"Vhdj.k% ^^of̀) ds ckn dqy Hkkj** esa ls ^^ekStwnk Loh—r Hkkj ;k vuqca/k ekax tSlk Hkh ekeyk** dks ?kVkdj vfrfjDr Hkkj izkIr gksxkA**À uksV % 1-9-2017 ds ckn] ;fn dqy Hkkj ds vk/kkj ij of)Zr izfrHkwfr tek yh tkrh gS] rks mi&fofu;e ¼8½ ds vuqlkj lek;kstu ds ckn 'ks"k jkf'k miHkksDrk ds vkxkeh fcy ¼fcykssa½ esa lek;ksftr dh tk,xhA 3-0 izeq[k fofu;eksa ds fofu;e 21 ds mi&fofu;e ¼2½ esa la'kks/ku% izeq[k fofu;eksa ds fofu;e 21 esa] mi&fofu;e ¼2½ ds nwljs çko/kku dks Li"Vhdj.k ds lkFk fuEukuqlkj çfrLFkkfir fd;k tk,xk% ^^c'krsZ fd Loh—r Hkkj ds m/oZxkeh ¼vioMZ½ la'kks/ku ds ekeys esa tgka lfoZl ykbu okLro esa cny nh xbZ gks] miHkksDrk }kjk varjh; lfoZl ykbu lg fodkl izHkkj dk Hkqxrku fo|qrh—r {ks=ksa ;k xSj&fo|qrh—r {ks=ksa] tSlk Hkh ekeyk gks] ds fy, ekStwnk njksa ds vk/kkj ij vfrfjä Hkkj gsrq fd;k tk,xk% ¿Li"Vhdj.k% ^^o`f) ds ckn dqy Hkkj** esa ls ^^lfoZl ykbu lg fodkl izHkkj ds vuqlkj vf/kdre Hkkj ftldk Hkqxrku igys gh fd;k tk pqdk gS** ?kVkdj vfrfjDr Hkkj izkIr gksxkAÀ 4-0 izeq[k fofu;eksa ds fofu;e 22 ds mi&fofu;e ¼1½ esa la'kks/ku% izeq[k fofu;eksa ds fofu;e 22 esa] mi&fofu;e ¼1½ ds fy,] fuEufyf[kr dks çfrLFkkfir fd;k tk,xk] uker% ^^¼1½ ykblsal/kkjh ls fo|qr dh vkiwfrZ ds fy, vkosnu djus okyk fodkldrkZ ;k vkosnd fxzM lcLVs'ku] VªkalQkeZj] fLop fx;j] ehVj] midj.k bR;kfn ds mRFkkiu vkSj LFkkiuk ds fy, miHkksäk vkSj ykblsal/kkjh ds chp ijLij lgefr ds vk/kkj ij] vk;ksx ds vkns'kksa esa vf/klwfpr visf{kr vk;keksa ds vuqlkj mi;qDr Hkwfe LFkku dks lqfo/kktud txg ij fu'kqYd miyC/k djk,xkk% c'krsZ fd tgka fodkldrkZ ,d ljdkjh ,tsalh gS] rks Hkwfe LFkku jk"Vªh; jkt/kkuh {ks= fnYyh ljdkj ds ek/;e ls ekStwnk uhfr ds vuqlkj miyC/k djk;k tk,xk% ^^c'krsZ fd tgka fdlh {ks= esa dksbZ fof'k"V fodkldrkZ ugha gS vkSj Hkkj ekax dks iwjk djus ds fy, ekStwnk forj.k ç.kkyh ds lao/kZu gsrq fxzM lcLVs'ku] VªkalQ‚eZj] fLop fx;j vkfn dh LFkkiuk ds fy, Hkwfe LFkku dh vko';drk gS] ogka forj.k ykblsal/kkjh jk"Vªh; jkt/kkuh {ks= fnYyh ljdkj ls] ,slh txg dh vko';drk ds iaæg fnuksa ds Hkhrj] Hkwfe LFkku ds vkoaVu ds fy,] lac) {ks=ksa esa miyC/k laHkkfor Hkwfe LFkku dk ladsr nsrs gq,] laidZ djsxkA** 5-0 izeq[k fofu;eksa ds fofu;e 29 dk la'kks/ku%

(1) izeq[k fofu;eksa ds fofu;e 29 esa] mi&fofu;e ¼3½ ds ckn] fuEufyf[kr izko/kku lfEefyr fd;k tk,xk] uker% ^^c'krsZ fd tgka ykblsal/kkjh }kjk ,d LekVZ ehVj LFkkfir fd;k tkuk gS] miHkksDrk ds ikl mlds ifjlj ds vanj LekVZ ehVj dh LFkkiuk ds fy, vuqjks/k djus dk fodYi miyC/k gksxk vkSj ,sls lHkh ekeyksa esa ykblsal/kkjh dks miHkksDrk ds ifjlj ds vanj ,slk ehVj LFkkfir djuk gksxkA**

(2) izeq[k fofu;eksa ds fofu;e 29 esa] mi&fofu;e ¼4½ ds fy,] fuEufyf[kr dks izfrLFkkfir fd;k tk,xk] uker% ^^¼4½ cgq&eaftyk bekjrksa ds ekeys esa] ehVj vf/kekur% Hkwry ij mfpr goknkj vkSj i;kZIr jks'kuh okys LFkku ij LFkkfir fd, tk,axsA** lqjsanzk bMqi?kaVh] lfpo [PART III DELHI GAZETTE : EXTRAORDINARY 3 uksV % izeq[k fofu;e 17 vxLr] 2017 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- ua- 218 ij çdkf'kr fd, x, Fks vkSj çFke la'kks/ku fofu;e 16 Qjojh] 2018 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- ua- 447 ij çdkf'kr fd;k x;k FkkA DELHI ELECTRICITY REGULATORY COMMISSION NOTIFICATION Delhi, the 12th October, 2018 Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Second Amendment) Regulations, 2018 No. F. 17(85)/DERC/Engg./2017-18/5855/2680.–Pursuant to the directions received from the Govt. of NCT of Delhi under Section 108 of the Electricity Act, 2003 and also to bring more clarity and ease in implementation of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017, the Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Section 46, 50 read with Section 57, 181 of the Electricity Act, 2003 (Act 36 of 2003) and all other powers enabling it in this behalf and after previous publication, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 (hereinafter referred to as “the Principal Regulations”):

1.0 Short title and commencement:

(1) These Regulations may be called the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Second Amendment) Regulations, 2018.

(2) These Regulations shall come into effect from the date of their publication in the official Gazette.

2.0 Amendment of Regulation 20 of Principal Regulations:

(1) In Regulation 20 of Principal Regulations, in the second proviso of sub-Regulation (1), for the word and figure ‘1MVA’, the word and figure ‘100kW’ shall be substituted.

(2) The sub-Regulation (7) of Regulation 20 of Principal Regulations shall be substituted as under:- “(7) In case of transfer of connection, the security deposit in the name of preceding consumer shall stand transferred in the name of the applicant and no additional security deposit shall be taken.”

(3) The sub-Regulation (8) of Regulation 20 of Principal Regulations shall be substituted as under:- “(8) In case of upward revision of sanctioned load or contract demand of consumer, the consumer shall be liable to pay the additional security deposit corresponding to additional load at prevailing rates of security deposit on the date of enhancement.” {Explanation: The additional load shall be the “Total Load after enhancement” minus “Existing Sanctioned Load or Contract Demand as the case may be”.} Note: After 1.9.2017, in case if the enhanced security deposit is taken based on total load, the balance amount after adjusting as per sub- Regulation (8) shall be adjusted in the ensuing bill(s) of the consumer.

3.0 Amendment of sub-Regulation (2) of Regulation 21 of Principal Regulations:

In Regulation 21 of Principal Regulations, the second proviso alongwith explanation of sub-Regulation (2) shall be substituted as under:- “Provided further that where the service line is actually changed in case of upward revision of sanctioned load, the differential Service Line cum Development Charges shall be payable by the consumer for 4 DELHI GAZETTE : EXTRAORDINARY PART III] additional load based on the prevailing rates for electrified areas or un-electrified areas as the case may be:

{Explanation: The additional load shall be the ”Total Load after enhancement” minus “Maximum Load corresponding to which Service Line cum Development Charges have already been paid”.}

4.0 Amendment of sub-Regulation (1) of Regulation 22 of Principal Regulations:

In regulation 22 of Principal Regulations, for sub-Regulation (1), the following shall be substituted namely:- “(1) The developer or the applicant applying for supply of electricity from the Licensee shall provide free of charge, the applicable land space of requisite dimensions as notified in the Commission’s Orders, at a convenient location, as may be mutually agreed between the consumer and the Licensee, for erection and installation of grid substations, transformers, switch gear, meter, equipment, etc.:

Provided that where the developer is a Government Agency, the land space shall be provided through Government of National Capital Territory of Delhi as per the prevailing policy:

Provided further that where there is no specific developer in an area and the augmentation of the existing distribution system to meet out the load demand requires the land space for installation of grid substations, transformers, switch gears, etc., the distribution licensee shall approach the Government of National Capital Territory of Delhi, within fifteen days of such requirement, for allotment of land space, indicating the probable land space available in such areas.”

5.0 Amendment of Regulation 29 of Principal Regulations:

(1) In regulation 29 of Principal Regulations, after sub-Regulation (3), the following proviso shall be inserted namely:

“Provided that where a smart meter to be installed by the licensee, the consumer shall have the option to request for installation of the smart meter inside his premises and in all such cases the licensee shall install such meter inside the premises of the consumer.”

(2) In Regulation 29 of Principal Regulations, for sub-Regulation (4), the following shall be substituted namely:

“(4) In case of the multi-storey buildings, the meters shall be installed preferably on the ground floor in a space having proper ventilation and adequate illumination.” SURENDRA EDUPGHANTI, Secy.

Note : The Principal Regulations were published on 17th August, 2017 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 218 and 1 st Amendment Regulations were published on 16 th February, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 447.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

7741 DG /2018 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 11] fnYyh] lkseokj] fnlEcj 31] 2018@ikS"k 10] 1940 ¹jk-jk-jk-{ks-fn- la- 697 No. 11] DELHI, MONDAY, DECEMBER 31 , 2018/PAUSHA 10, 1940 [N.C.T.D. No. 697 Hkkx—III

PART—III —————— jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI ————————— fnYyh fo|qr fofu;ked vk;ksx vf/klwpuk fnYyh] 28 fnlEcj] 2018 fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼r`rh; la'kks/ku½ fofu;e] 2018 la- ,Q-17¼85½@MhbZvkjlh@bath-@2018&19@6213@3195.—jk"Vªh; jkt/kkuh {ks= fnYyh ljdkj ls fo|qr vf/kfu;e] 2003 dh /kkjk 108 ds v/khu izkIr funsZ'kksa ds vuqlj.k esa] fo|qr vf/kfu;e] 2003 ¼2003 ds vf/kfu;e 36½ dh /kkjk 46] 50 ds lkFk ifBr /kkjk 57] 181¼1½ ,oa 181¼2½ }kjk iznÙk 'kfDr;kas rFkk bl laca/k esa bldks l{ke cukus okyh vU; lHkh 'kfDr;ksa dk iz;ksx djrs gq,] ,rn~}kjk fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ fofu;e] 2017 ¼blds i'pkr ^^izeq[k fofu;e^^ ds :i esa mfYyf[kr½ ds fuEufyf[kr fofu;eksa esa la'kks/ku fd;k tkrk gS%& 1-0 y?kq 'kh"kZd vkSj izkjaHku

(1) bu fofu;eksa dks fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼r`rh; la'kks/ku½ fofu;e] 2018 dgk tk,A

(2) ;s fofu;e vkf/kdkfjd jkti= esa viuss izdk'ku dh frfFk ls izHkkoh gksaxsA 2-0 izeq[k fofu;eksa ds fofu;e 70 esa la'kks/ku % izeq[k fofu;eksa ds fofu;e 70 esa] mi&fofu;e ¼7½ ds ckn] fuEufyf[kr dks lfEefyr fd;k tk,xk] uker% ¼8½ fctyh vkiwfrZ cgky gksus ds ckn] miHkksDrk dks cgkyh dh frfFk vkSj le; ds lkFk ,d iqf"Vdj.k lans'k Hkstk tk,xkA 3-0 izeq[k fofu;eksa ds fofu;e 76 esa la'kks/ku% izeq[k fofu;eksa ds fofu;eu 76 {kfriwfrZ jkf'k ds fu/kkZj.k vkSj Hkqxrku gsrq çfØ;k* dks fuEukuqlkj çfrLFkkfir fd;k tk,xk %& 2 DELHI GAZETTE : EXTRAORDINARY PART III] 76- {kfriwfrZ jkf'k ds fu/kkZj.k vkSj Hkqxrku gsrq çfØ;k%&

(1) lkekU;%

(i) ykblsal/kkjh viuh osclkbV ij {kfriwfrZ ds nkoksa dk fuiVkjk djus ds fy, vius dk;kZy;ksa vkSj ukfer vf/kdkfj;ksa dh lwph viyksM djsxkA

(ii) {kfriwfrZ gsrq lHkh Hkqxrku] miHkksDrk ds lh, uacj ds lkis{k ntZ dh xbZ fo|qr vkiwfrZ gsrq orZeku rFkk@vFkok Hkkoh fcyksa ds lek;kstu }kjk fd;k tk,xk % c'krsZ fd ;fn vkosnd ds {kfriwfrZ dk Hkqxrku gksrk gS tksfd miHkksDrk ugha gS] rks ykblsal/kkjh] udnh ds vykok vk;ksx }kjk Loh—r Hkqxrku ds fdlh Hkh ek/;e ls bldh {kfriwfrZ nsxkA

(2) fctyh vkiwfrZ foQyrk ds vykok fu"iknu ds ekudksa esa gksus okyh fdlh Hkh foQyrk gsrq%

(i) dksbZ Hkh O;fDr tks ;gka ij fufnZ"V fd, x, fu"iknu ds ekudksa dks iwjk djus esa ykblsal/kkjh dh foQyrk ls çHkkfor gksrk gS rFkk {kfriwfrZ dk nkok djuk pkgrk gS] og O;fä vius nkos dks ,sls ykblsal/kkjh dh foQyrk ds }kjk çHkkfor gksus dh frfFk ls vf/kdre 60 ¼lkB½ fnuksa dh vof/k ds Hkhrj ntZ djk ldrk gS A

(ii) ykblsal/kkjd] çHkkfor O;fDr ¼O;fDr;ksa½ ds nkos dh ntZ djus dh frfFk ls ysdj 90 ¼uCcs½ fnuksa dh vf/kdre vof/k ds Hkhrj {kfriwfrZ nsxk% c'krsZ fd ykblsal/kkjd fu/kkZfjr djrk gS fd {kfriwfrZ dh jkf'k çHkkfor miHkksDrk dks ns; ugha gS] ykblsal/kkjh] viuh dk;Zokgh gsrq miHkksDrk dks lquokbZ dk volj çnku djds] mudh dk;Zokgh ds fy, mfpr vkSfpR; nsus ds i'pkr dkj.kksa dks fyf[kr :i esa fjd‚MZ djsxk rFkk bUgha fjd‚MksaZ dks miHkksDrk ds lkFk lapkfjr djsxkA

(iii) ml fLFkfr esa ;fn ykblsal/kkjh fu/kkZfjr djrk gS fd çHkkfor miHkksDrk dks fdlh Hkh {kfriwfrZ dk Hkqxrku ugha fd;k tkuk gS vFkok ;fn çHkkfor O;fDr vius nkos ds xSj&fuiVku ls vlarq"V gksrk gS] rks vlarq"V O;fä ,slh {kfriwfrZ dh ekax ds djus ds lkFk gh mudh f'kdk;rksa ds fuokj.kkFkZ lacaf/kr Qksje ls laidZ dj ldrk gSA

(iv) ;fn vlarq"V O;fä Qksje ds fu.kZ; ls larq"V ugha gS] rks çHkkfor miHkksDrk viuh f'kdk;r ds fuokj.kkFkZ yksdiky ls laidZ dj ldrk gSA

(v) ;fn dkuwu dh mfpr çfØ;k ds i'pkr] fdlh ekeys ds :i esa] fu"iknu ds ekudksa ds mYya?ku gsrq {kfriwfrZ ds nkos dks Qksje ;k yksdiky }kjk lgh Bgjk;k tkrk gS] rks bu fofu;eksa dh vuqlwph&1 ds vuqlkj {kfriwfrZ dk fu/kkZj.k fd;k tk,xk :

c'krsZ fd Qksje ;k yksdiky {kfriwfrZ esa vfrfjDr jkf'k ds rkSj ij] {kfriwfrZ ds igyh ckj ns; gksus dh frfFk ls ml vof/k gsrq cSad nj ij C;kt Loh—r djrs gSaA

(vi) Qksje vFkok yksdiky }kjk tkjh funsZ'k dh rkjh[k ls 90 ¼uCcs½ fnuksa ds Hkhrj] tSlk Hkh ekeyk gks] ykblsal/kkjh }kjk {kfriwfrZ ns; gksxhA

(3) fo|qr vkiwfrZ dh cgkyh gsrq çn'kZu ds ekudksa esa fdlh Hkh foQyrk gsrq :

(i) ;fn ykblsal/kkjh fctyh vkiwfrZ dh cgkyh ds ekudksa dks iwjk djus esa foQy jgrk gS] rks çHkkfor miHkksDrk dks {kfriwfrZs dh jkf'k ykblsal/kkjh }kjk Lor% Hkqxrku djuh gksxh] blds fy, miHkksDrk dks fdlh Hkh çdkj ds nkos dks ntZ djkus dh vko';drk ugha gSA

(ii) ykblsal/kkjd fiNys fcfyax pdz ds nkSjku gqbZ ¼i½ fu/kkZfjr fo|qr dVkSfr;ksa dh le;kof/k] ¼ii½ vyx ls gqbZ vfu/kkZfjr fo|qr dVkSfr;ksa dh le;kof/k ,oa ns; {kfriwfrZ dh jkf’k dk fooj.k izR;sd orZeku fcy esa layXu djsxsa% c'krsZ fd mu lHkh ifjfLFkfr;ksa esa tgka ykblsal/kkjh nkok djrk gS fd fo|qr vkiwfrZ dh foQyrk gksus ij og ftEesnkj ugha gS] ykblsal/kkjh mijksDr dFku esa mudh dkjZokbZ gsrq mfpr vkSfpR; çnku djus esa çR;sd voLFkk ds lHkh dkj.kksa dks fyf[kr :i esa fjd‚MZ djsxkA c'krsZ blds vfrfjDr ;fn fiNys fcfyax pØ ds nkSjku dksbZ Hkh dVkSrh u dh xbZ gks] rks fcy esa forjd ykblsal/kkjh }kjk 'kwU; dVkSfr;ka n'kkZus okyk ,d fooj.k layXu fd;k tk,xkA

(iii) tgka fo|qr vkiwfrZ dh foQyrk ls ,d miHkksDrk ;k ,d ls vf/kd miHkksDrk çHkkfor gksrs gSa] ml fLFkfr esa {kfriwfrZ dh x.kuk ds mís'; gsrq {kfriwfrZ jkf'k dk fu/kkZj.k fdlh Hkh miHkksDrk ds }kjk izFke ckj f'kdk;r djus dh vof/k ls vakdfyr fd;k tk,xkA

(iv) ;fn dbZ miHkksDrkvksa dk lewg çHkkfor gksrk gS] rks ykblsal/kkjh vius futh vfHkys[kksa ls lHkh çHkkfor miHkksDrkvksa dh igpku djsxkA

(v) ykblsal/kkjh fiNys fcfyax pØ dh vafre frfFk ls 90 fnuksa ds Hkhrj lHkh çHkkfor miHkksDrkvksa dks {kfriwfrZs dk Hkqxrku djsxk] ftlds fy, {kfriwfrZ ds fooj.k dks miHkksäk ds lh, uacj ds lkis{k fcy esa ØsfMV ds ek/;e ls layXu fd;k x;k FkkA miHkksDrk dks ,d iqf"Vdj.k lans'k Hkh Hkstk tk,xkA [PART III DELHI GAZETTE : EXTRAORDINARY 3

(vi) ml fLFkfr esa ;fn ykblsal/kkjh fu/kkZfjr djrk gS fd çHkkfor miHkksDrkvksa ds fy, dksbZ Hkh {kfriwfrZ ns; ugha gS ;k ;fn çHkkfor O;fä viuh f'kdk;rksa ds xSj&fuokj.k ls ihfM+r gS vFkok çHkkfor miHkksDrk dk ekuuk gS fd fo|qr vkiwfrZ dh foQyrk gsrq layXu fooj.k okLro esa vuqfpr gS] rks çHkkfor O;fDr bl rjg ds {kfriwfrZs dh f'kdk;rksa ds fuokj.k gsrq lacaf/kr Qksje ls laidZ dj ldrk gSA

(vii) ;fn ihfM+r O;fä Qksje ds fu.kZ; ls larq"V ugha gS] rks çHkkfor miHkksDrk yksdiky ls laidZ dj ldrk gSA

(viii) tgka fctyh dh vkiwfrZ dh foQyrk ds fu"iknu ds ekudksa ds mYya?ku ds fy, {kfriwfrZ dk nkok Qksje ;k yksdiky }kjk lgh Bgjk;k tkrk gS] tSlk Hkh ekeyk gks] ogka dkuwu dh mfpr çfØ;k ds vuqlj.k ds ckn] ,sls ekeyksa esa {kfriwfrZ dh jkf'k #-5000@& vFkok ewy :i ls ns; {kfriwfrZ dk ikap xquk] tks Hkh vf/kd gks] gksxhA

(ix) Qksje vFkok yksdiky }kjk tkjh funsZ'k dh rkjh[k ls 90 ¼uCcs½ fnuksa ds Hkhrj] tSlk Hkh ekeyk gks] ykblsal/kkjh }kjk {kfriwfrZ ns; gksxhA

(x) ykblsal/kkjh lkIrkfgd vk/kkj ij ,slh lHkh ØsfMV {kfriwfrZ dh ,d fjiksVZ vk;ksx ds ikl tek djsxkA 4-0 izeq[k fofu;eksa dh vuqlwph I esa la'kks/ku%

(1) ^çn'kZu ds xkjaVh'kqnk ekud vkSj fMQkWYV ds ekeys esa miHkksDrkvksa dks {kfriwfrZ ds izeq[k fofu;eksa dh vuqlwph&I esa] ^fctyh vkiwfrZ foQyrk* dh fcanq la-14 vkSj ^fVIi.kh* dks fuEukuqlkj çfrLFkkfir fd;k tk,xk%& “14- fctyh vkiwfrZ dh foQyrk

(a) fdlh miHkksDrk ds fy, fctyh vkiwfrZ foQyrk gsrq {kfriwfrZ] cgkyh ds fy, ekud vkSj ns; {kfriwfrZ fuEukuqlkj gksxk% Ø-la- lsok {ks= fctyh vkiwfrZ dh cgkyh ds fy, ekud fMQ‚YV dh vof/k dh x.kuk ekud ds mYya?ku ds ekeys esa fMQ‚YV vof/k gsrq miHkksDrk dks ns;

{kfriwfrZ ¼1½ ¼2½ ¼3½ ¼4½ ¼5½

(i) fofu;e 83 esa mfYyf[kr NwV dks NksM+dj] iwjs fnu ds nkSjku] fdlh Hkh dkj.k ls vfu/kkZfjr fctyh foQyrk ,d ?kaVs ds vanj fdlh Hkh çHkkfor miHkksDrk }kjk nk;j izFke f'kdk;r ds le;

ls ,d fnu gsrq ,d ?kaVs ds varjky ds cknA fMQ‚YV ds izFke nks ?kaVksa ds fy, çfr miHkksDrk çfr ?kaVs 50 #i,A mlds ckn] izfr miHkksDrk çfr ?kaVk 100 #i,A

(ii) fofu;e 83 esa mfYyf[kr NwV dks NksM+dj] mlh fnu ij mlh miHkksDrk ds lkFk] fdlh Hkh dkj.k ls] vfu/kkZfjr fctyh foQyrk dh ?kVuk nqckjk gksuk rqjar fdlh Hkh çHkkfor miHkksDrk }kjk nk;j izFke f'kdk;r ds rqjar cknA fMQ‚YV ds izFke nks ?kaVksa ds fy, çfr miHkksDrk çfr ?kaVs 50 #i,A mlds ckn] izfr miHkksDrk çfr ?kaVk 100 #i,A

(iii) fu/kkZfjr fctyh dVkSrh 12 ?kaVs ds Hkhrj ;k fnu esa lk;a 6 cts rd fctyh vkiwfrZ dh cgkyhA j[kj[kko dh fu/kkZfjr 'kq#vkr ls 12 ?kaVs ds varjky ls ;k fnu ds lk;a 6 cts ds ckn] tks Hkh igys gksA fMQ‚YV ds izFke nks ?kaVksa ds fy, çfr miHkksDrk çfr ?kaVs 50 #i,A mlds ckn] izfr miHkksDrk çfr ?kaVk 100 #i,A

(iv) tyk ehVj ;k pksjh gq, ehVj dh izfrLFkkiuk tys ehVj dks ckbZikl djds ;k vLFkk;h ehVj LFkkfir djds rhu ?kaVs ds Hkhrj vkiwfrZ dh cgkyh djukA miHkksDrk }kjk nk;j f'kdk;r ds le; ls 3 ?kaVs ds varjky ds cknA fMQ‚YV ds izFke nks ?kaVksa ds fy, çfr miHkksDrk çfr ?kaVs 50 #i,A mlds ckn] izfr miHkksDrk çfr ?kaVk 100 #i,A

(v) ehVj dks rhu fnuksa ds Hkhrj cny fn;k tk,xk miHkksDrk }kjk nk;j f'kdk;r ds le; ls 3 fnuksa ds varjky ds cknA fMQ‚YV ds izR;sd fnu 50 #i,A 4 DELHI GAZETTE : EXTRAORDINARY PART III] ¼b½ fctyh foQyrk ds dkj.k mRiUu gksus okys fdlh Hkh nkos dks] mu miHkksDRkkvksa ds fy, Lohdk;Z ugha ekuk tk,xk] ftudh fiNys fcfyax o"kksaZ rd cdk;k jkf'k gS] ;k ftUgsa fiNys nks o"kksaZ ds nkSjku] ;k rks fctyh dh pksjh ds fy, nks"kh Bgjk;k x;k gS ;k fctyh ds vuf/k—r mi;ksx ds fy, ftudk vafre ewY;kadu fd;k x;k gSA fVIi.kh%

(i) ekud ds mYya?ku ds ekeys esa miHkksDrk ds {kfriwfrZ ds fu/kkZj.k ds mís'; ds fy,] fMQ‚YV vof/k ds fy, ekud ls ijs fnu dSysaMj fnuksa ds :i esa fy, tk,axsA

(ii) tgka ns; {kfriwfrZ dks fnuksa esa fMQ‚YV ds vk/kkj ij fufnZ"V fd;k x;k gS vkSj fMQ‚YV fnu ds fgLls ds fy, gS rc {kfriwfrZ iwjs fnu ds fy, ns; gksxkA

(iii) tgka ns; {kfriwfrZ dks ?kaVksa esa fMQ‚YV vk/kkj ij fufnZ"V fd;k x;k gS vkSj fMQ‚YV ,d ?kaVs ds ,d fgLls ds fy, gS] rc {kfriwfrZ ;Fkkuqikr vk/kkj ij ns; gksxkA** egsUnz flag] lfpo uksV% izeq[k fofu;e 17 vxLr] 2017 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- ua- 218 esa çdkf'kr fd, x, Fks] çFke la'kks/ku fofu;e 16 Qjojh] 2018 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- ua- 447 esa çdkf'kr fd;k x;k Fkk vkSj f}rh; la'kks/ku fofu;e 15 vDrwcj] 2018 dks fnYyh jkti=] vlk/kkj.k] Hkkx III esa ,u-lh-Vh-Mh- ua- 663 esa çdkf'kr fd;k x;k Fkk DELHI ELECTRICITY REGULATORY COMMISSION NOTIFICATION Delhi, the 28th December, 2018 Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Third Amendment) Regulations, 2018 No. F.17(85)/DERC/Engg./2018-19/6213/3195 – Pursuant to the directions received from the Govt. of NCT of Delhi under Section 108 of the Electricity Act, 2003, the Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Section 46, 50 read with Section 57, 181(1) and 181(2) of the Electricity Act, 2003 (Act 36 of 2003) and all other powers enabling it in this behalf, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 (hereinafter referred to as “the Principal Regulations”):

1.0 Short title and commencement:

(1) These Regulations may be called the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Third Amendment) Regulations, 2018.

(2) These Regulations shall come into effect from the date of their publication in the official Gazette.

2.0 Amendment of Regulation 70 of Principal Regulations:

In regulation 70 of Principal Regulations, after sub-Regulation (7), the following shall be inserted namely:

(8) After restoration of power supply, a confirmation message shall be sent to the consumer with restoration date and time.

3.0 Amendment of Regulation 76 of Principal Regulations:

Regulation 76 of Principal Regulations ‘Procedure for Determination and payment of compensation amount’ shall be substituted as under:-

76. Procedure for Determination and Payment of compensation amount:-

(1) General:

(i) The Licensee shall upload on its website the list of its offices and designated officers to settle claims for compensation.

[PART III DELHI GAZETTE : EXTRAORDINARY 5

(ii) All payments of compensation shall be made by way of adjustment in current and/or future bills for supply of electricity raised against CA Number of the consumer:

Provided that in case the compensation is paid to the applicant who is not consumer, the Licensee shall compensate by any mode of payment other than cash as approved by the Commission.

(2) For failure of standards of performance other than power supply failure:

(i) Any person who is affected by the failure of the Licensee to meet the standards of performance specified herein and who seeks to claim compensation shall file his claim with the concerned Licensee within a maximum period of 60 (sixty) days from the date such a person is affected by such failure of the Licensee to meet the standards of performance.

(ii) The Licensee shall compensate the affected person(s) within a maximum period of 90 (ninety) days from the date of filing his claim:

Provided that in case the Licensee determines that compensation is not payable to the affected consumer, the Licensee shall record the reasons in writing after giving opportunity to the consumer of being heard, giving due justification for their action and communicate the same to the consumer.

(iii) In case the Licensee determines that no compensation is payable to the affected consumer or if the affected person is aggrieved by non-settlement of his claim, the aggrieved person may approach the respective Forum for redressal of grievances to seek such compensation.

(iv) If the aggrieved person is not satisfied with the decision of the Forum, the affected consumer may approach the Ombudsman for redressal of his grievance.

(v) In case the claim for compensation for violation of standards of performance is upheld by the Forum or Ombudsman, as the case may be, after following due process of Law, the compensation shall be determined in accordance with the Schedule-I of these Regulations:

Provided that the Forum or the Ombudsman may in addition to the compensation, award interest at the bank rate for the period from date when the compensation became first due.

(vi) The compensation shall be payable by the licensee but not later than 90 (ninety) days from the date of a direction issued by the Forum or by the Ombudsman, as the case may be.

(3) For failure of standards of performance for restoration of power supply:

(i) In case the licensee fails to meet the standards for restoration of power supply, the compensation shall be payable automatically by the licensee to all the affected consumers, without requiring a claim to be filed by the consumer.

(ii) The licensee shall enclose a statement of (i) scheduled power outages, (ii) unscheduled power outage separately occurred during previous billing cycle and the amount of compensation payable to the consumer in each instance to the current bill:

Provided that in all such cases where the Licensee claims that the power supply failure is not attributable to him, the Licensee shall record the reasons in writing, for each instance giving due justification for their action in the above statement:

Provided further that if there is no outage during the previous billing cycle, a statement indicating nil outage shall be enclosed by the distribution licensee to the bill.

(iii) Where failure of power supply is affecting one consumer or more than one consumer, the default for the purpose of computing compensation shall be considered from the time first complaint is made by any of the affected consumer.

(iv) In case a group of consumers is affected, the licensee shall identify all the affected consumers from their own records.

(v) The licensee shall pay compensation to all the affected consumers within 90 days from the last date of previous billing cycle for which statement of compensation was enclosed, by way of credit in the bill for supply of electricity raised against the CA number of the consumer. A confirmation message to the consumer shall also be sent.

(vi) In case the Licensee determines that no compensation is payable to affected consumers or if the affected person is aggrieved by non-redressal of his grievances or the affected consumer believes 6 DELHI GAZETTE : EXTRAORDINARY PART III] that the statement enclosed for power supply failure is factually incorrect, the aggrieved person may approach the respective Forum for redressal of grievances to seek such compensation.

(vii) If the aggrieved person is not satisfied with the decision of the Forum, the affected consumer may approach the Ombudsman.

(viii) Where the claim for compensation for violation of standards of performance for power supply failure is upheld by the Forum or Ombudsman, as the case may be, after following due process of Law, the amount of compensation in such cases shall be Rs. 5000/- or five times of the compensation payable originally, whichever is higher.

(ix) The compensation shall be payable by the licensee but not later than 90 (ninety) days from the date of a direction issued by the Forum or by the Ombudsman, as the case may be.

(x) The licensee shall submit a report to the Commission of all such credited compensations on weekly basis.

4.0 Amendment of Schedule-I of Principal Regulations:

(1) In Schedule-I of Principal Regulations on ‘Guaranteed Standards of performance and Compensation to Consumers in case of default’, Point no. 14 on ‘Power Supply Failure’ and ‘Note’ shall be substituted as under:- “14. Power Supply Failure

(a) Compensation for power supply failure, standard for restoration and compensation payable for a consumer shall be as under:

Sl. No. Service Area Standard for restoration of power supply Computation of period of default Compensation payable to the consumer for the period of default in case of violation of standard

(1) (2) (3) (4) (5)

(i) Unscheduled power failure for any reason whatsoever, for a single time during an entire day, except the exemption as mentioned at Regulation 83 Within One Hour After lapse of one hour for a day from the time 1 st complaint has made by any of the affected consumer.

Rs. 50 per hour per consumer for the first two hours of default.

Thereafter, Rs. 100 per hour per consumer.

(ii) Re-occurrence of Unscheduled power failure for any reason whatsoever, to same consumer on same day, except the exemption as mentioned at Regulation 83 Immediate Immediately after 1 st complaint has made by any of the affected consumer.

Rs. 50 per hour per consumer for the first two hours of default.

Thereafter, Rs. 100 per hour per consumer.

(iii) Scheduled power outages Within 12 hours or restoration of power supply by 6PM in a day From the lapse of 12 hours from the scheduled start of maintenance or after 6PM of the day whichever is earlier Rs. 50 per hour per consumer for the first two hours of default.

Thereafter, Rs. 100 per hour per consumer.

(iv) Replacement of burnt meter or stolen meter Restoration of supply within three hours either by bypassing the burnt meter or by installing temporary meter.

After lapse of 3 hours from the time consumer has made the complaint Rs. 50 per hour per consumer for the first two hours of default.

Thereafter, Rs. 100 per hour per consumer

(v) Meter to be replaced within three days After lapse of 3 days from the time consumer has made the complaint Rs.50 for each day of default [PART III DELHI GAZETTE : EXTRAORDINARY 7

(b) Any claim arising on account of power failure shall not be admissible for those consumers who have outstanding dues upto preceding billing cycle, or have been, during last two years, either convicted for theft of electricity or finally assessed for Unauthorised Use of Electricity.

Note:

(i) For the purpose of determination of compensation to the consumer in case of violation of standard, the days beyond the standard for period of default shall be taken as calendar days.

(ii) Where the compensation payable has been specified based on default in days and the default is for a part of the day, the compensation shall be payable for the whole day.

(iii) Where the compensation payable has been specified based on default in hours and the default is for a part of the hour, the compensation shall be payable on pro-rata basis.” MAHENDER SINGH, Secy.

Note: The Principal Regulations were published on 17 th August, 2017 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 218, 1 st Amendment Regulations were published on 16 th February, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 447 and 2 nd Amendment Regulations were published on 15 th October, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 633.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

2657 DG/2019 (1) jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99 GOVERNMENT OF INDIA vlk/kj.k EXTRAORDINARY çkf/dkj ls çdkf'kr PUBLISHED BY AUTHORITY la- 01] fnYyh] ebZ 27] 2019@T;s"B 6] 1941 ¹jk-jk-jk-{ks-fn- la- 52 No. 01] DELHI, MONDAY, MAY 27, 2019/ JYAISTHA 6, 1941 [N.C.T.D. No. 52 Hkkx—III

PART—III —————— jk"Vªh; jktèkkuh jkT; {ks=k] fnYyh ljdkj GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI —————— fnYyh fo|qr fofu;ked vk;ksx vf/klwpuk fnYyh] 27 ebZ, 2019 fnYyh fo|qr fofu;ked vk;ksx ¼vkiwfrZ dksM rFkk fu"iknu ekud½ ¼prqFkZ la'kks/ku½ fofu;e] 2019 संसंसंसं. . . . एफएफएफएफ.17(85)/.17(85)/.17(85)/.17(85)/डीईआरसीडीईआरसीडीईआरसीडीईआरसी////इंजीइंजीइंजीइंजी./2019./2019./2019./2019----2020/64322020/64322020/64322020/6432/418/418/418/418-—�द�ली िव ुत िविनयामक आयोग, िव ुत अिधिनयम, 2003 (2003 के अिधिनयम 36) क� धारा 46, 50 के साथ प�ठत धारा 57, 181 के �ारा �द� शि!य" का �योग करते #ए तथा इस संबंध म( इसको स)म बनाने वाली अ+य सभी शि!य" का �योग करते #ए एवं िपछले �काशन" के प.ात् एत0ारा �द�ली िव ुत िविनयामक आयोग (आपू2त3 कोड तथा िन5पादन मानक) िविनयम, 2017 (इसके प.ात "�मुख िविनयम" के 7प म( उि�लिखत) के िन9िलिखत िविनयम" म( संशोधन �कया जाता ह:ै

1.0 लघ ुशीष�क और �ारंभनलघ ुशीष�क और �ारंभनलघ ुशीष�क और �ारंभनलघ ुशीष�क और �ारंभन:

(1) इन िविनयम" को �द�ली िव ुत िविनयामक आयोग (आपू2त3 कोड तथा िन5पादन मानक) (चतुथ3 संशोधन) िविनयम, 2019 कहा जाए।

(2) ये िविनयम आिधका�रक राजप> म( अपने �काशन क� ितिथ से �भावी ह"गे। 2 DELHI GAZETTE : EXTRAORDINARY PART III]

2.0 �मुख िविनयम� के िविनयम �मुख िविनयम� के िविनयम �मुख िविनयम� के िविनयम �मुख िविनयम� के िविनयम 17 17 17 17 के उपके उपके उपके उप----िविनयम िविनयम िविनयम िविनयम (1) (1) (1) (1) म� संशोधनम� संशोधनम� संशोधनम� संशोधन �मुख िविनयम" के िविनयम 17 म(, उप-िविनयम (1) हतुे, िन9िलिखत को इनसे �ित@थािपत �कया जाएगा:-

(1) कने�शन का ह�तांतरणकने�शन का ह�तांतरणकने�शन का ह�तांतरणकने�शन का ह�तांतरण

(i) य�द �कसीय�द �कसीय�द �कसीय�द �कसी भी आवेदक को �कसी भी काभी आवेदक को �कसी भी काभी आवेदक को �कसी भी काभी आवेदक को �कसी भी कारण स ेकने�शन केरण स ेकने�शन केरण स ेकने�शन केरण स ेकने�शन के ह�तांतरण क� आव�यकता होतीह�तांतरण क� आव�यकता होतीह�तांतरण क� आव�यकता होतीह�तांतरण क� आव�यकता होती है जैस े�क है जैस े�क है जैस े�क है जैस े�क सपंि� के �वािम�व या अिधभोग म# प$रवत%न के कारण उपभो'ा केसपंि� के �वािम�व या अिधभोग म# प$रवत%न के कारण उपभो'ा केसपंि� के �वािम�व या अिधभोग म# प$रवत%न के कारण उपभो'ा केसपंि� के �वािम�व या अिधभोग म# प$रवत%न के कारण उपभो'ा के नाम म# प$रवत%ननाम म# प$रवत%ननाम म# प$रवत%ननाम म# प$रवत%न, कानूनी कानूनी कानूनी कानूनी उ�रािधकारी को ह�तांतरण आ�दउ�रािधकारी को ह�तांतरण आ�दउ�रािधकारी को ह�तांतरण आ�दउ�रािधकारी को ह�तांतरण आ�द, तो वह आयोग के आदेश( म# अिधसूिचत िनधा%$रत +ा,प म# तो वह आयोग के आदेश( म# अिधसूिचत िनधा%$रत +ा,प म# तो वह आयोग के आदेश( म# अिधसूिचत िनधा%$रत +ा,प म# तो वह आयोग के आदेश( म# अिधसूिचत िनधा%$रत +ा,प म# लाइस#सधारीलाइस#सधारीलाइस#सधारीलाइस#सधारी के पास आवेदनके पास आवेदनके पास आवेदनके पास आवेदन करेगाकरेगाकरेगाकरेगा:

बशतA �क उन मामल" म( जहां उप-पंजीयक काया3लय क� �णाली स े डेटा �ाD #आ हो, जैस े �क नए मािलक के नाम पर संपि� के @वािमEव के ह@तांतरण के बाद िवFेता के िववरण (नाम, सीए नंबर इEया�द) और Fेता क� जानकारी (नाम, ईमले, मोबाइल नंबर), तब िवतरण लाइस(सधारी अलग से �कसी अनुरोध और अित�र! द@तावेज" को �@तुत करने क� आवHयकता के िबना कनेIशन के ह@तांतरण क� ��Fया को पूरा करेगा: बशतA यह भी �क ऐसे मामल" म(, य�द संपि� को कई मािलक" के नाम पर ह@तांत�रत �कया जा रहा ह,ै तो कनेIशन पहल ेमािलक के नाम पर ह@तांत�रत �कया जाएगा: बशतA यह भी �क य�द संपि� के अ+य मािलक िबजली कनेIशन के िलए अपना नाम जोड़ना चाहते हM, तो वे नाम बदलने हतुे आवHयक द@तावेज" सिहत िवतरण लाइस(सधारी स ेअनुरोध कर(गे।

(ii) आवेदन म# �कसी भी कमी को िलिखत ,प म# सूिचत �कयाआवेदन म# �कसी भी कमी को िलिखत ,प म# सूिचत �कयाआवेदन म# �कसी भी कमी को िलिखत ,प म# सूिचत �कयाआवेदन म# �कसी भी कमी को िलिखत ,प म# सूिचत �कया जाएगा। आवेदन केवल ऐसी किमय( को जाएगा। आवेदन केवल ऐसी किमय( को जाएगा। आवेदन केवल ऐसी किमय( को जाएगा। आवेदन केवल ऐसी किमय( को हटाने पर ही �वीकार �कया जाएगा।हटाने पर ही �वीकार �कया जाएगा।हटाने पर ही �वीकार �कया जाएगा।हटाने पर ही �वीकार �कया जाएगा।

(iii) कने�शन के ह�तातंरण हेतु अनुरोध को तब तक �वीकार नह6 �कया जाएगा जब तक �क संबंिधत कने�शन के ह�तातंरण हेतु अनुरोध को तब तक �वीकार नह6 �कया जाएगा जब तक �क संबंिधत कने�शन के ह�तातंरण हेतु अनुरोध को तब तक �वीकार नह6 �कया जाएगा जब तक �क संबंिधत कने�शन के ह�तातंरण हेतु अनुरोध को तब तक �वीकार नह6 �कया जाएगा जब तक �क संबंिधत कने�शन के संबंध म# सभी वसलूी यो7य बकायाकने�शन के संबंध म# सभी वसलूी यो7य बकायाकने�शन के संबंध म# सभी वसलूी यो7य बकायाकने�शन के संबंध म# सभी वसलूी यो7य बकाया का पूण% ,प स ेभगुतान नह6 �कया जाता ह8का पूण% ,प स ेभगुतान नह6 �कया जाता ह8का पूण% ,प स ेभगुतान नह6 �कया जाता ह8का पूण% ,प स ेभगुतान नह6 �कया जाता ह8: बशतA �क एक बार कनेIशन ह@तांत�रत हो जाने पर, नए उपभो!ा से �कसी भी दये रािश / बकाया नहN वसूला जाएगा।

(iv) आवेदन क� �वीकृित या बकाए के समाशोधनआवेदन क� �वीकृित या बकाए के समाशोधनआवेदन क� �वीकृित या बकाए के समाशोधनआवेदन क� �वीकृित या बकाए के समाशोधन, जो भी बाद म# होजो भी बाद म# होजो भी बाद म# होजो भी बाद म# हो, के बादके बादके बादके बाद आवेदक के नाम का प$रवत%न आवेदक के नाम का प$रवत%न आवेदक के नाम का प$रवत%न आवेदक के नाम का प$रवत%न दो िब:लंग च;( के भीतर +भावी होगा।दो िब:लंग च;( के भीतर +भावी होगा।दो िब:लंग च;( के भीतर +भावी होगा।दो िब:लंग च;( के भीतर +भावी होगा। बशत� �क उन मामल म� जहां उप-पंजीयक काया�लय क� �णाली स े �ा� डटेा के आधार पर नाम प!रवत�न �कया गया ह,ै िवतरण लाइस�सधारी, य�द वांिछत ह,ै तो नए उपभो,ा को आव-यकता अनुसार द0तावेज जमा करने के िलए कह सकता ह:ै बशत� यह भी �क उन मामल म� जहां उप-पंजीयक काया�लय क� �णाली से �ा� डटेा के आधार पर नाम प!रवत�न �कया गया ह,ै तथा िववाद के मामल म�, िवतरण लाइस�सधारी, य�द वांिछत ह,ै तो संबंिधत उप-पंजीयक काया�लय से द0तावेज को मांगने का िवक2प भी हो सकता ह:ै बशत< यह भी �क नए िबजली कने�शन जारी करने हेतु िनयम( एवं शत= क� घोषणा सिहत िविनयबशत< यह भी �क नए िबजली कने�शन जारी करने हेतु िनयम( एवं शत= क� घोषणा सिहत िविनयबशत< यह भी �क नए िबजली कने�शन जारी करने हेतु िनयम( एवं शत= क� घोषणा सिहत िविनयबशत< यह भी �क नए िबजली कने�शन जारी करने हेतु िनयम( एवं शत= क� घोषणा सिहत िविनयम( के म( के म( के म( के +ावधान नए उपभो'ा और लाइस#सधारी पर भी लागू ह(गे।+ावधान नए उपभो'ा और लाइस#सधारी पर भी लागू ह(गे।+ावधान नए उपभो'ा और लाइस#सधारी पर भी लागू ह(गे।+ावधान नए उपभो'ा और लाइस#सधारी पर भी लागू ह(गे।

(v) य�द आवेदक के नाम का प$रवत%न दो िब:लंग च;( के भीतर नह6 होता हैय�द आवेदक के नाम का प$रवत%न दो िब:लंग च;( के भीतर नह6 होता हैय�द आवेदक के नाम का प$रवत%न दो िब:लंग च;( के भीतर नह6 होता हैय�द आवेदक के नाम का प$रवत%न दो िब:लंग च;( के भीतर नह6 होता है, तो उपभो'ा मआुवजे क� तो उपभो'ा मआुवजे क� तो उपभो'ा मआुवजे क� तो उपभो'ा मआुवजे क� मांग का हकदार होगा औरमांग का हकदार होगा औरमांग का हकदार होगा औरमांग का हकदार होगा और लाइस#सधारी िविनयमलाइस#सधारी िविनयमलाइस#सधारी िविनयमलाइस#सधारी िविनयम क� अनुसचूीक� अनुसचूीक� अनुसचूीक� अनुसचूी-I म# िनAद%B �कए गए मुआवजे काम# िनAद%B �कए गए मुआवजे काम# िनAद%B �कए गए मुआवजे काम# िनAद%B �कए गए मुआवजे का भगुतान करने के िलभगुतान करने के िलभगुतान करने के िलभगुतान करने के िलए उ�रदायी होगा।ए उ�रदायी होगा।ए उ�रदायी होगा।ए उ�रदायी होगा।" मह+ेO Pसंह, सिचव [PART III DELHI GAZETTE : EXTRAORDINARY 3 नोटनोटनोटनोट: �मुख िविनयम 17 अग@त, 2017 को �द�ली राजप>, असाधारण, भाग III म( एन.सी.टी.डी. सं. 218 पर �कािशत �कए गए थ,े �थम संशोधन िविनयम 16 फरवरी, 2018 को �द�ली राजप>, असाधारण, भाग III म( एन.सी.टी.डी. सं. 447 म( �कािशत �कया गया था और ि�तीय संशोधन िविनयम 15 अ!ूबर, 2018 को �द�ली राजप>, असाधारण, भाग III म( एन.सी.टी.डी. स.ं 633 म( �कािशत �कया गया था तथा तृतीय संशोधन िविनयम को 31 �दसंबर, 2018 को �द�ली राजप>, असाधारण, भाग III म( एन.सी.टी.डी. सं. 697 म( �कािशत �कया गया था। DELHI ELECTRICITY REGULATORY COMMISSION NOTIFICATION Delhi, the 27th May, 2019 Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Fourth Amendment) Regulations, 2019 No. F.17(85)/DERC/Engg./2019-2020/6432/418—The Delhi Electricity Regulatory Commission, in exercise of the powers conferred by Section 46, 50 read with Section 57, 181 of the Electricity Act, 2003 (Act 36 of 2003) and all other powers enabling it in this behalf and after previous publication, hereby makes the following Regulations to amend the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 (hereinafter referred to as “the Principal Regulations”):

1.0 Short title and commencement:

(1) These regulations may be called the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Fourth Amendment) Regulations, 2019.

(2) These regulations shall come into effect from the date of their publication in the official Gazette.

2.0 Amendment of sub-Regulation (1) of Regulation 17 of Principal Regulations:

In regulation 17 of Principal Regulations, for sub-Regulation (1), the following shall be substituted namely:- "(1) Transfer of connection

(i) If any applicant wants transfer of connection due to any reason such as change of consumer’s name due to change in ownership or occupancy of property, transfer to legal heir, etc. he shall apply to the Licensee in the prescribed format as notified in the Commission’s Orders:

Provided that in cases where the data has been received from the system of Sub-Registrar Office such as details of seller (name, CA number(s) etc.) and buyer’s information (Name, email, mobile number) after the transfer of ownership of property in the name of new owner, the distribution licensee shall process transfer of connection without requirement of filing a separate request and additional documents:

Provided further that in such cases, if the property is being transferred in the name of multiple owners, the connection will be transferred in the name of first owner:

Provided also that if other owner(s) of the property wants to add their name for electricity connection, they shall request the distribution licensee alongwith the supporting documents as required for name change.

4 DELHI GAZETTE : EXTRAORDINARY PART III]

(ii) Any deficiency in the application shall be intimated in writing. The application shall be accepted only on removal of such deficiencies.

(iii) The request for transfer of connection shall not be approved unless all recoverable dues in respect of the concerned connection are fully paid:

Provided that once connection is transferred, no dues / arrears shall be recovered from the new consumer.

(iv) The change of applicant’s name shall be effected within two billing cycles, after acceptance of application or clearing of dues whichever is later:

Provided that in cases where the name change has been effected based on data received from the system of Sub-Registrar Office, the distribution licensee, if so desire, may ask the new consumer to submit the documents as required:

Provided further that in cases where the name change has been effected based on data received from the system of Sub-Registrar Office, and in cases of dispute, the distribution licensee, if so desire, may also have option to seek the documents from the concerned Sub-Registrar Office:

Provided also that the provisions of the Regulations including terms and conditions of declaration for release of new electricity connection shall also be applicable to new consumer and the Licensee.

(v) If the change of applicant’s name is not effected within two billing cycles, the consumer shall be entitled to seek and the Licensee shall be liable to pay the compensation as specified in Schedule-I of the Regulations.” MAHENDER SINGH, Secy.

Note: The Principal Regulations were published on 17th August, 2017 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 218, First Amendment Regulations were published on 16 th February, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 447, Second Amendment Regulations were published on 15th October, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 633 and Third Amendment Regulations were published on 31st December, 2018 in the Delhi Gazette, Extraordinary, Part III at N.C.T.D. No. 697.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

2017-08-24T19:58:49+0530 RAKESH SUKUL

Where this provision sits

ActDelhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Section2017
Marginal note82. Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005
JurisdictionUnion territory of Delhi
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulatio… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.