Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Union territory Regulations of Delhi · 200379 provisions
The enactment
| Type | Regulations |
|---|---|
| Year | 2003 |
| Jurisdiction | Union territory of Delhi |
| Status | In force as published by the source |
| Provisions published | 79 |
| Subjects | environment |
Full text, provision by provision
Every provision below opens in full, free and without an account.
- Section 1 Short title, extent and commencement
- Section 2 Definitions
- Section 3 Interpretations
- Section 4 System of Supply
- Section 5 Safety of electrical installations
- Section 6 Classification and Categorization of Supply
- Section 7 Wiring in the premises of the consumer
- Section 8 Harmonics dumping
- Section 9 Distribution of electricity through franchisee
- Section 10 New and Existing Connections
- Section 11 New Electricity Connection
- Section 13 Conversion of single point connection to individual connection
- Section 14 Procedure for full conversion of single point connection into individual connection
- Section 15 Procedure for partial conversion of single point connection into individual connection
- Section 16 Temporary Connection
- Section 17 Existing connections
- Section 18 Agreement
- Section 19 Termination of Agreement
- Section 20 Security Deposit
- Section 21 Service-Line-cum Development (SLD)
- Section 22 Space for installation of grid substation, transformers, service line, meter and other equipment
- Section 23 The safe custody of the meter and other equipment of the Licensee
- Section 24 Procedure for shifting electric line or electrical plant of the Licensee
- Section 25 Procedure for shifting of meter or service line within the premises of the consumer
- Section 27 Requirement of meters
- Section 28 Option of the applicant/consumer to purchase the meter
- Section 29 Supply and installation of meters and circuit breakers
- Section 30 Reading of meters
- Section 31 Consequence of making the meter inaccessible for reading
- Section 32 Testing of meter
- Section 33 Stolen Meter
- Section 34 Replacement of Defective Meters/Burnt Meters/Stolen Meters
- Section 35 Replacement of Meters in Bulk
- Section 36 Cost of Meters
- Section 37 Adoption of new technologies for metering
- Section 39 Billing in case of defective or damaged meter
- Section 40 Billing in case of burnt meter
- Section 41 Billing in case of stolen meter
- Section 42 Recovery of Arrears
- Section 43 Payment on self assessment by the consumer
- Section 44 Advance payment of anticipated bills by consumer
- Section 45 Disputed bills
- Section 46 Payment of bills and charges for delayed payments
- Section 47 Receipt for the payment of the bill
- Section 48 Appropriation of the amount received
- Section 49 Installment facility and incentive for early payment
- Section 50 Grounds for disconnection
- Section 51 Procedure for Disconnection
- Section 52 Prevention from Unauthorized Reconnection
- Section 53 Disconnection on Consumer’s request
- Section 54 Reconnection
- Section 55 General
- Section 56 Inspections of the premises and electrical installations by Assessing Officer
- Section 57 Preparation of Report by Assessing officer
- Section 58 Procedure for dealing the case of Unauthorized Use of Electricity (UUE)
- Section 59 Appeal before Appellate Authority under Section 127 of the Act
- Section 60 Inspections of the premises and electrical installations by Authorized officer
- Section 61 Preparation of Report by Authorized officer
- Section 62 Procedure for prosecution for Theft of Electricity
- Section 63 Assessment Bill for theft of electricity
- Section 64 Suspected Theft
- Section 65 Compounding of the offence under section 152 of the Act
- Section 66 Restoration of supply disconnected on account of theft of electricity
- Section 67 Voluntary disclosure of tampered meter
- Section 68 General
- Section 69 Procedure for lodging complaint
- Section 70 Procedure for redressal of complaint on no current/failure of power supply
- Section 71 Procedure for redressal of complaint on low/high voltage
- Section 72 Redressal of Grievances by Forum and Ombudsman
- Section 73 Guaranteed standards of performance
- Section 74 Determination of Compensation
- Section 75 Penalty
- Section 76 Procedure for Determination and payment of compensation amount
- Section 77 Information on Standards of Performance
- Section 78 Notice to the Consumer
- Section 79 Accident at the installation of the consumer
- Section 80 Demand Side Management
- Section 81 Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014
- Section 2017 82. Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005
Find the provision, not just read it
The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:
- Search 49,000+ Central and State enactments by what a provision says, not by its number
- Jump from any section to every judgment that has applied it
- Search 300 million+ Indian court records alongside the statute
- Ask a research agent to find and read the case law on a provision for you
Free account. No card. About a minute to create.
Create a free accountNeed this as data, not as a page? Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulatio… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.