CourtMesh

Section 34: Replacement of Defective Meters/Burnt Meters/Stolen Meters

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017Union territory Regulations of Delhi · 2003

(1) In the event of suspected defective meter or burnt meter or stolen meter, the Licensee shall restore supply through a new meter within the time period specified under these Regulations:

Provided that, if meter cannot be replaced immediately, the Licensee shall restore the supply without meter within the time period specified under these Regulations after ensuring that necessary preventive action at site is taken to avoid future loss.

(2) In all such cases, where supply is restored without a meter, the Licensee shall give the same in writing to the consumer or his representative, indicating his full name, ID Card / Employee number with signature:

Provided that pending replacement of the meter, wherever the supply has been restored without a meter by the Licensee, a case of theft of electricity shall not be booked for the period of supply without the meter, and Consumer’s complaint for replacement of suspected defective meter or burnt meter or stolen meter, shall be considered sufficient for this purpose.

[PART III DELHI GAZETTE : EXTRAORDINARY 87

(3) The Licensee and the consumer, as the case may be, shall take necessary corrective action to avoid such damage in future.

(4) If as a result of inspection or testing it is established that the meter has become defective or damaged or burnt due to technical reasons such as voltage fluctuation, transients etc. attributable to the Licensee, the cost of replacement of the meter and/or its associated equipment, as the case may be, shall be borne by the Licensee.

(5) If it is established that the meter was rendered defective or damaged or burnt due to reasons attributable to the consumer, such as defect in installation of the consumer, connection of unauthorized load etc., by the consumer, the cost of replacement of the meter and/or its associated equipment, as the case may be, shall be borne by the consumer:

Provided that the consumer may provide his own meter and/or associated equipment, as the case may be, to the Licensee.

(6) In case of stolen meter, the cost of replacement of meter and/or associated equipment, as the case may be, shall be borne by the consumer or the Licensee, whosoever is responsible for safe custody of meter.

{Explanation: Replacement of meter and/ or associated equipment shall mean the equipment which is required to be replaced and not the complete arrangement.}

Where this provision sits

ActDelhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Section34
Marginal noteReplacement of Defective Meters/Burnt Meters/Stolen Meters
JurisdictionUnion territory of Delhi
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulatio… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.