CourtMesh

Section 57: Preparation of Report by Assessing officer

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017Union territory Regulations of Delhi · 2003

(1) In the event of detection of unauthorized use of electricity, the Assessing officer shall prepare a detailed Report at site, in the manner as prescribed in the Commission’s Orders.

(2) All the material evidences such as tampered meter, etc. and the documentary evidence, which are relevant to the case found during the inspection, shall be seized under a seizure memo and sealed in the presence of the consumer or his representative and be kept as a proof along with photography and video recording of the premises.

(3) A detailed description of the material seized, including date, time and place and name & address of witnesses to the seizure shall be recorded on the exterior of the cover and signatures of all witnesses shall be affixed on the sealing points:

Provided that if the witness refused to sign, the same shall be recorded in the report and captured in the videograph.

(4) The Inspection Report shall be signed by the Assessing officer and a copy of the same shall be handed over to the consumer or his representative at the site immediately under proper acknowledgement. The other persons present at site may also sign the inspection report.

(5) If consumer or his representative at site refuses to acknowledge and/or accept the copy of the report, a copy of the report shall be pasted at a conspicuous place in or outside the premises and photographed and video recorded. Another copy of the same report shall be sent to the consumer under Registered Post or Speed Post or electronically on the same day or on the next day of the inspection.

(6) The Inspection report shall form the basis for further action as per the provisions contained in Regulations.

Where this provision sits

ActDelhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Section57
Marginal notePreparation of Report by Assessing officer
JurisdictionUnion territory of Delhi
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulatio… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.