Last stop signal of a station can be combined, if required due to inadequate length of block section, with the first stop signal of a station in advance, or with a stop signal protecting a level crossing ahead under special instructions and in such cases, arrangement shall be so made so as to ensure that the combined signal cannot be taken ‘OFF’ unless the conditions for taking ‘OFF’ of each of the respective signals of the constituents of that combined signals are fulfilled and if it is protecting a level crossing gate, then the level crossing gate has been closed and locked for the passage of train.
D - Kind of fixed signals in automatic block territory
Need this as data, not as a page? GSR 765 (E) Dedicated Freight Corridor Railway General Rules, 2018. is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.