(1) Every Fixed signal shall be so constructed that, in case of failure of any part of its connections, it shall remain at its most restrictive aspect.

(2) (a) a signal which has been taken 'OFF' for the passage of a train shall not be placed at 'ON' until the whole of the train for which it has been taken ‘OFF’ has passed it, except in case of emergency, or, where arrangement is provided to restore the signal 'automatically', in which case the control operating the signal shall not be restored to its normal position till the whole of the train has passed it;

184 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(i)]

(b) when in an emergency, if a signal has to be put back to "ON" before passage of full train, no points or locks shall be moved until train has come to a stop, and station master has, except where route alteration is pre-empted by signal interlocking, confirmed it from the loco pilot through the approved means of communication;

(c) whenever it is intended to put back departure signal of a departing train to "ON" due to change in planning, before the signals are taken "ON", the station master shall first advise the loco pilot on approved means of communication not to start his train. Thereafter the starter and advanced starter shall be put back to "ON', and except where route alteration is pre-empted by signal interlocking, points shall be changed only after a gap of two minutes; and

(d) whenever the loco pilot observe change in departure signal before or just about passing over it, he shall stop his train and proceed further only on instructions of station master on duty received on approved means of communication.

(3) (a) no fixed signal within station limits shall be taken 'OFF' without the permission of the station master on duty and in the case of a signal outside the station limits without the permission of such railway servant as may for the time being be in independent charge of the working of such signal; and

(b) under no circumstances, a signal shall be taken ‘OFF’ by resorting to methods other than those prescribed by instruction issued in the matter.

Where this provision sits

ActGSR 765 (E) Dedicated Freight Corridor Railway General Rules, 2018.
Section66
Marginal noteFixed signals generally
JurisdictionCentral
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? GSR 765 (E) Dedicated Freight Corridor Railway General Rules, 2018. is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.