(1) The calling-on signal shall except when permitted otherwise under special instructions detect all the points falling in the route which the main signal above it detects excluding those points which fall within the signal overlap.
(2) The calling-on signal shall be taken ‘OFF’ only after the train has come to a stop, at the stop signal below which the calling-on signal is provided.
Need this as data, not as a page? GSR 765 (E) Dedicated Freight Corridor Railway General Rules, 2018. is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.