(a) the whole of the last preceding train has passed complete at least 400 meters beyond the Home signal and is continuing its journey; and
(b) all signals taken 'OFF' for the preceding train have been put back to ‘ON’ behind the said train;
Provided that on a single line the line is also clear of trains running in the opposite direction towards the station from the block station at the other end.
¹Hkkx IIµ[k.M 3(i)º Hkkjr dk jkti=k % vlk/kj.k 191 F - Conditions for granting Line Clear and shunting or obstruction at a Special Class station on a single line or double line or multiple line or twin single line—
88. Conditions for granting Line Clear and shunting or obstruction at a Special Class station shall be prescribed in the Station Working Rule of the concerned station keeping in mind local conditions, layout, and conditions for granting Line Clear and shunting or obstruction as specified for 'B' and 'C' class stations in these rules.