Section 12: System Studies by the Nodal Agency

The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Relate…State Regulations of Himachal Pradesh · 2003

(1) On receipt of the application, the nodal agency shall, in consultation and through co-ordination with other agencies involved in intra-State transmission/ distribution system to be used, process the application and carry out the necessary system studies as expeditiously as possible so as to ensure that the decision to grant long-term access is arrived at within the timeframe specified in regulation 7:

Provided that in case the nodal agency faces any difficulty in the process of consultation or co-ordination, it may approach the Commission for appropriate directions.

(2) Based on the system studies, the nodal agency shall specify the intra- State transmission/distribution system that would be required to give long-term access. In case augmentation to the existing intra-State transmission/ distribution system is required, the same will be intimated to the applicant.

1 Sub-regulations (3), (4), (5) and (6) omitted vide Not. No. HPERC/ 418 dated 7 th December, 2012, published in R H.P. dated 10 th December, 2012 at p. 5409-5415. before omission the said sub regulations (3),

(4),(5) and (6) stood as under:- “(3) The application shall be accompanied by a bank guarantee of Rs 10,000/- (Rupees ten thousand) per MW of the total power to be transmitted. The bank guarantee shall be in favour of the nodal agency, in the manner laid down under the detailed procedure.

(4) The bank guarantee of Rs. 10,000/- (Rupees ten thousand) per MW shall be kept valid and subsisting till the execution of the long-term access agreement, in the case when augmentation of transmission/distribution system is required, and till operationalisation of the long-term access when augmentation of transmission/ distribution system is not required.

(5) The bank guarantee may be encashed by the nodal agency, if the application is withdrawn by the applicant or the long-term access rights are relinquished prior to the operationalisation of such rights when augmentation of transmission/ distribution system is not required.

(6) The aforesaid bank guarantee will stand discharged with the submission of bank guarantee required to be given by the applicant to the State Transmission Utility/ licensee during construction phase when augmentation of transmission/distribution system is required, in accordance with the provisions in the detailed procedure.” 10 Compendium of HPERC Regulations, March 2021

Where this provision sits

ActThe Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and Related Matters) Regulations, 2010
Section12
Marginal noteSystem Studies by the Nodal Agency
JurisdictionState of Himachal Pradesh
StatusIn force as published by the source

Find the provision, not just read it

The full text above is free, and it stays free. What a free CourtMesh account adds is everything you cannot do by reading one page at a time:

  • Search 49,000+ Central and State enactments by what a provision says, not by its number
  • Jump from any section to every judgment that has applied it
  • Search 300 million+ Indian court records alongside the statute
  • Ask a research agent to find and read the case law on a provision for you

Free account. No card. About a minute to create.

Create a free account

Need this as data, not as a page? The Himachal Pradesh Electricity Regulatory Commission (Grant of Connectivity, Long-term… is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.