(1) The Commission shall monitor the following quality of supply parameters during the control period: -
(a) transmission system availability;
(b) transformer failure, across various capacities which represents the number of transformer failures as a percentage of the total number of transformers in that specified capacity within the transmission system, over a specified period of time.
[
(2) The transmission licensee in its business plan filings shall submit and propose the trajectory for the achievement of quality targets. The Commission will lay down the targets for each parameter in the MYT order. The transmission licensee shall submit its performance on each parameter in the form and manner laid down by the Commission.
1 Subs. vide Not No. HPERC-F(1)-3/2018 dated 22 nd November, 2018 published in the R H.P. dated 27 th November, 2018 at p. 6256-6264. Before its substitution read as under:
“26. Refund of excess amount.- The licensee shall recover the charges as determined by the Commission. Where any licensee recovers charges exceeding those determined by the Commission, the excess amount shall be refunded to the person who has paid such excess charges, alongwith interest equal to the prevalent 1[Base Rate of the State Bank of India plus 350 basis points] without prejudice to any other liability incurred by such licensee.” 24 Compendium of HPERC Regulations, March 2021 1 [30. Safety Standards.- The transmission licensee shall develop a safety manual and comply with regulations framed in this regard by the Central Electricity Authority (CEA) under section 53 and section 177 (2) (b) of the Act.]
PART-IV PRINCIPLES FOR DETERMINATION OF TRANSMISSION TARIFF/ CHARGES