(1) The fixed cost of the transmission system shall be computed on annual basis, in accordance with norms contained in these regulations, aggregated as appropriate, and recovered on monthly basis as transmission charge from the users.
(2) The transmission charge (inclusive of incentive) payable for a calendar month for a transmission system or part thereof shall be- AFC x ( NDM / NDY ) x ( TAFM / NATAF ) Where, AFC = Annual fixed cost specified for the year, in Rupees;
NATAF = Normative annual transmission availability factor, in per cent specified in regulation 0;
NDM = Number of days in the month;
NDY = Number of days in the year; and TAFM= Transmission system availability factor for the month, in percent, computed in accordance with Appendix-II to these Regulations.
(3) The transmission licensee shall raise the bill for the transmission charge (inclusive of incentive) for a month based on its estimate of TAFM. Adjustments, if any, 1 Subs. for “Short Term Prime Lending rate of the State Bank of India” vide Not. no.
HPERC/F(5)(3)(1)(Trans) dated 1 st November,2013 published in the R H.P. dated 4 th November, 2013 at p.
4608 to 4618. Before substitution regulation 30 read as under:
“30. Safety Standards The transmission licensee shall develop a safety manual and follow procedures to maintain atleast minimum safety standards during construction, operation, etc. in line with provisions of section 53 of the Act.” 2 Ins. vide Not. no. HPERC/F(5)(3)(1)(Trans) dated 1 st November,2013 published in the R H.P. dated 4 th November, 2013 at p. 4608 to 4616.
Compendium of HPERC Regulations, March 2021 25 shall be made on the basis of the TAFM to be certified by the SLDC within 30 days from the last day of the relevant month:
Provided that wherever it is necessary or expedient to incentivise the open access, the Commission may, by order, cap the transmission charges calculated under this subregulation.