:.ihe open access customers-shall comply with the provisions of the Grld Code in iorce from time to tlma.
33. Collection and Disbursement of0charge,.:.._(i) ihe transmission chattJM and wheeling charges shall be payable directly to respective STU and/or llc13~sees:
(ii) Scheduling and system operation charges shall be collected by the State Load Despatch Centre. The State Load Despatch Centre may require the transmlsslon/ wheeling charges and scheduling and system operational cflaf~es !EJ be paid iri advance for a maximum period of dHe month, the 81:llall~d pffi~etllife for which shall · be finalised· by the State Load D@§~~tch Centre. ·
(iii) Long term customers shall pay Rs. thirty thousand (Rs. 30.000.00) as annual service charge for scheduling and system operation etc. to State Load Despatch Centre.
---------- I · 1 Based on the experience of operation of open access in phase I, the Commission may revise the schedule for the allowing open access in subsequent phases.
The Commlssicn may-allow 0pP,n access toconsumers with less than 1 MVA contract demand at such time as it may consider feasible having regard to operational constraints and other factors.
A person covered by a policy of the State Government, or availing open access on the date of commencement of these regulations, relating to captive generation or generation through non-conventional energy sources shall be eligible to avail open access irrespective of contract demand.