The fee to be levied while issuing the permit for installation of Telecommunication Infrastructure Tower shall be as per the table-1 below:- Table-1 Fee structure for installation of telecommunication infrastructure tower Sl.
No.
Jurisdiction One time Prescribed fee per tower 01 Bruhat Bangalore Mahanagara Palike Rs. 1,00,000 02 Corporations of the City other than Bruhat Bangalore Mahanagara Palike Rs. 50,000 03 City Municipal Councils Rs. 35,000 04 Town Municipal Councils Rs.25,000 05 Town Panchayaths Rs.20,000 06 Gram Panchayaths Rs.15,000 The property owner shall pay property taxes as per relevant rules.
8 For Cell on Wheels, Micro sites and in-building solutions the fee prescribed by Department of Information Technology shall be applicable.
By order and in the name of the Governor of Karnataka S. Veena Under Secretary to Government, Urban Development Department (MA-2).
APPENDIX- A (See rule 8 (x)(a)) COMPLETION CERTIFICATE BY ARCHITECT, ENGINEER etc.
Certified that the development or re-development of land or construction or reconstruction or alteration or addition of building or erection of telecommunication tower or pole structure or work has been supervised by me and has been completed as per the approved plan and permit No………………….dated………………..
Signature Name and address of Architect or Building Designer or Engineer or Town Planner or Supervisor Reg No.:
Place:
Date:
COMPLETION CERTIFICATE BY THE OWNER (See rule 8 (x)(a)) Certified that the development or redevelopment of land or construction or reconstruction or alteration or addition of building or erection of telecommunication tower or pole structure has been completed or partially completed as per the approved plan and permit No……….……..
dated………………..
(Signature) Name and address of owner:
Place:
Date:
APPENDIX-B (See rule 8 (x)(b)) OCCUPANCY CERTIFICATE OR USE CERTIFICATE Certified that the construction or reconstruction or alteration or addition of building or erection of telecommunication tower or pole structure or work under the permit No………………….dated………………..issued to…..……………………….. and supervised by………………………………..has been inspected by me and that the work executed is in accordance with the permit and that the building or tower or pole structure is now fit for occupation or use.
Place:
Date : (Seal and Signature of Sanctioning Authority) By Order and etc…, S. Veena Under Secretary to Government, Urban Development Department (MA-2).
À̧PÁðj ªÀÄÄzÀæuÁ®AiÀÄ, «PÁ¸À ¸ËzsÀ WÀlPÀ, É̈AUÀ¼ÀÆgÀÄ. (¦7) ¥ÀæwUÀ¼ÀÄ: 500