(1) Neither ~e - granting of the permission nor the approval of drawings and specifications nor inspections made by the Agency during erection of the building shall in any way relieve the applicant and owner of such building from its responsibility of carrying out the work in accordance with the requirements of these rules and the provisions of the applicable Development Scheme.
(2) Every applicant or owner shall-
(a) permit the Agency or person authorized by it or the Building Officer or person duly authorized _ by him to enter in the building or premises for which the permit has been granted at any reasonable time for the purpose of ensuring the comptiance of these rules;
• (b) submit a document of ownership or ·right of interest in relation to the site;
( c) obtain, where applicable, from ·the respective Authorities, permissions relating to building, zoning, grades, sewers, wat~r-mains, plumbing, signs, blasting, street, occupancy, electricity, highways and all other permissions, required in connection with the proposed work;
( d) give notice to the Agency of the intention to start work on the building site in Form IX;
( e) give notice in ·writing to the Building Officer to arrange inspection when the work reaches plinth level in Form X;
(f) give written notice to the Agency regarding completion of work described in the permission in Form XI and;
(g) obtain permission for occupancy in Form XII from the Agency prior to any:-
(i) occupancy in the building or part there-of, after 222 (196) construction or· alteration of that building or part thereof; or
(ii) change in the class of occupancy of any building or part thereof;
(h) upon the request of the applicant or owner, the Agency will issue occupancy certificate of the • building within 30 days from the. receipt of such request. If such permission is not issued within 30 days from receipt of the application or ·suitable instructions for changes ·have not been issued by the Agency within the said period the occupancy permission shall be deemed to have been issued.
(3) In case of applicant or owner failing in fulfilling the responsibilities . and duties, the building officer will take action as per the relevant provisions of Act and Rules, as the case may be.