All fees and costs payable under the Act or Regulations or rules framed thereunder, shall be deposited into a Government Treasury in the State of Tripura under the Head of Account “ 087 – Labour & employment – Fees for inspection of Steam Boilers” by challan in triplicate, the original being forwarded to the Chief Inspector along with the application or otherwise as the case may be.
All fees and costs levied under the Act shall be disposed of in such a manner as the Government shall direct from time to time.
4. Calculation of registration and inspection fees, - Every application under subsection (I) of Section 7 and sub-section (3) of Section 8 shall be accompanied by a fee calculated on the basis of boiler rating as prescribed under regulation 384. The formula for calculating the boiler rating shall be as prescribed in regulation 383.
5. Fees for registration and first inspection of boilers shall be as prescribed in regulation 385.
6. Every application for inspection for the renewal of certificate under sub-section
(3) of section 8 shall be accompanied by a fee on the following scales:- “ For Boiler Heating surface in square metres not exceeding 10 Rs.
105/- For Boiler Heating surface in square metres exceeding 10 but not exceeding 30 - 130/- ... ... 30 ... ... 50 - 150/- ... ... 50 ... ... 70 - 180/- ... ... 70 ... ... 90 - 210/- ... ... 90 ... ... 110 - 240/- ... ... 110 ... ... 200 - 270/- ... ... 200 ... ... 400 - 315/- ... ... 400 ... ... 600 - 360/- ... ... 600 ... ... 800 - 405/- ... ... 800 ... ... 1000 - 450/- ... ... 1000 ... ... 1200 - 540/- ... ... 1200 ... ... 1400 - 600/- ... ... 1400 ... ... 1600 - 675/- ... ... 1600 ... ... 1800 - 750/- 3 “ For Boiler Heating surface in square metres exceeding 1800 but not exceeding 2000 - 825/- ... ... 2000 ... ... 2200 - 900/- ... ... 2200 ... ... 2400 - 975/- ... ... 2400 ... ... 2600 - 1050/- ... ... 2600 ... ... 2800 - 1125/- ... ... 2800 ... ... 3000 - 1200/- For Boiler Heating surface above 3000 for every 200 or part thereof an additional fee of Rs. 50 shall be charged”. Boils heating surfaces shall be determined as prescribed in Regulation 383.
Provided that when any owner is willing to accept any renewed certificated for less than twelve months in order to approximate the date of annual inspection to the date on which other boilers in the locality are inspected, a certificated for such period less then twelve months as may be necessary for such approximation of dates may be granted at the reduced fee to be calculated at one twelfth of the ordinary fee for each full month, portion of a month not being reckoned ;
Provided further that an additional fee equal to inspection fee may be charged for the inspection of a boiler on a Sunday or on other public holidays under the Negotiable Instruments Act, 1881, if such inspection is made at the request of the owner. The additional fee, so charge shall be paid in the manner specified in Rule 3. The Inspector who makes the inspection shall be entitled to an allowance equal to half the additional fee so charged.
7. Fees for inspection and test during construction –
(i) Fee for inspection of boilers and parts thereof under construction shall be the same as prescribed in Regulation 395 A.
(ii) (a) Cast mountings and fittings.
A fee of Rs. 150 shall be charged for examination and certification of a single lot of mountings and fittings made from the same cast but the number of items in one such lot shall not be exceeding 50.
(b) Fabricated mountings and fittings.
A fee of Rs. 150 shall be charged for examination and certification of a single lot of mountings and fitting and fittings not exceeding 10.
The manufacturer, in addition, shall supply free of charge the labour and appliances which may be necessary for such mechanical tests as are required under the regulations.
Failing to find facilities for the prescribed test, the manufacturer shall bear the cost of carrying out such tests elsewhere.
(c) The charges for the examination of drawings only for mountings and fittings to be manufacturer shall be Rs. 50 for each such drawing.
(d) Every applicant for appointment as an approved erector of repairer of boilers or for installation of or repairs to steam pipe ; inclusive 4 of fittings under Regulation 392 of Indian Boiler Regulations shall submit an application with a fee of Rs. 100 to the Chief Inspector of Boilers. If the Chief Inspector of Boilers is satisfied with the quality of welding, other erection, repairs and installations done by the applicant, he shall register the applicant as an approved erector or repairer. The registration may be renewed every year on an application made by the applicant. The same fee shall be charged for the renewal as for the grant thereof.
8. The fees mentioned in rule 6 shall cover complete inspection including hydraulic test and steam test, where such tests are necessary, subject to the provision of sub-section
(2) of section 14.