In case the number of members of the society opting for direct supply from Licensee after conducting joint survey are less than 2/3rd of the total members of the society, the following shall apply:-
(1) The member(s) opting for direct supply shall obtain the No Objection Certificate from the developer or registered association for taking direct supply from the Licensee.
(2) Such member(s) shall provide the consent of concerned developer or registered association for providing the adequate space at a convenient place for installing the transformers, allied equipments and meters, if required, at no cost to the Licensee.
(3) 50% cost required for providing connection shall be borne by the applicants in the ratio of the sanctioned load of such applicants.
(4) Security deposit at the time of conversion shall be payable by the applicant(s).