(1) Every portion of the overhead equipment, and connected works, Permanent way, bridges and connected works including, points and crossings, tunnels, and any other equipment or works affecting the safety and working of trains shall be inspected by the railway servant appointed in this behalf at such interval and in such manner as is prescribed by special instructions.
(2) If any condition which is likely to affect the safety of train is noticed, the official inspecting the line shall take immediate action to protect the trains as laid down under these rules, and thereafter take necessary action to rectify the defect.
Need this as data, not as a page? GSR 765 (E) Dedicated Freight Corridor Railway General Rules, 2018. is one of 49,000+ enactments on CourtMesh. The Indian court cases API serves the case law that cites these provisions over JSON, with API documentation and plans and pricing. See also the judgment library.